Document List by Author

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Donald C Jones of Jefferson Lab is listed as an author on the following documents:

SBS-doc-# Title Author(s) Topic(s) Last Updated
635-v1 ECal Status for collaboration meeting Sep 12, 2024 Donald C Jones Collaboration
Detector
Experiment
11 Sep 2024
634-v1 ECal fire engineer report Donald C Jones Engineering
09 Sep 2024
617-v1 Report on C16 prototype from 2015 Donald C Jones Analysis
Detector
Experiment
07 Aug 2024
615-v1 ECal update for SBS weekly meeting 08/07/24 Donald C Jones Engineering
Collaboration
Detector
Experiment
07 Aug 2024
606-v1 Thermocouple labels and locations on ECal Donald C Jones Detector
Experiment
18 Jul 2024
600-v2 Prototype heater test report Donald C Jones Detector
Experiment
11 Jul 2024
593-v1 ECal Weekly Meeting Update June 6, 2024 Donald C Jones Experiment
26 Jun 2024
583-v2 Determining the sign of the asymmetry for GEN Donald C Jones Analysis
Experiment
06 Jun 2024
571-v1 ECal weekly update 04/04/24 and 04/25/24 Donald C Jones Experiment
17 May 2024
566-v1 SAD schedule for ECal related things Donald C Jones Detector
Experiment
09 May 2024
537-v1 Cable routing discussion for GEP continued Donald C Jones Experiment
12 Mar 2024
519-v1 ECal Stacking, Stability and Cable Routing Donald C Jones Detector
15 Feb 2024
518-v3 ECal Heating Scheme Donald C Jones Detector
14 Feb 2024
481-v1 ECal weekly meeting slides for Dec 6, 2023 and Dec 21, 2023 Donald C Jones Detector
21 Dec 2023
457-v1 Bare Lead Glass Crystals around ECal heater prototype to demonstrate darkening Donald C Jones Detector
02 Nov 2023
449-v1 ECal installation planning Donald C Jones Collaboration
Detector
11 Oct 2023
383-v5 ERR ECal status talk Donald C Jones Detector
24 Apr 2023
386-v3 GEp Safety documents for 2024 running Pavel V. Degtiarenko et al. Experiment
21 Apr 2023
380-v1 ECal Installation Plan Donald C Jones Experiment
31 Mar 2023
365-v1 ECal Status Update Donald C Jones Detector
14 Feb 2023
348-v1 MOLLER Slides at SBS weekly meeting Donald C Jones Experiment
22 Dec 2022
345-v1 Dec 14, 2022 3 pass Moller polarization for GEn Donald C Jones Analysis
14 Dec 2022
332-v1 ECal front end schematics etc Donald C Jones Detector
04 Nov 2022
326-v1 Moller polarimetry measurement for GEn 2-pass Donald C Jones Analysis
19 Oct 2022
321-v2 GEn Moller polarimetry plan Donald C Jones Analysis
13 Oct 2022
302-v1 ECal Summing Module Test Results and Placement in DAQ Donald C Jones et al. Analysis
Detector
06 Sep 2022

Number of documents found: 26

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.6, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.26 usr + 0.07 sys = 0.33 CPU)