RC meeting and Run Plan, Monday February 27th
From SBS wiki
Revision as of 10:59, 27 February 2023 by Ewertz (Talk | contribs) (Created page with "=== RC Report === * https://logbooks.jlab.org/entry/4140085 * RC: Zeke Wertz ewertz@wm.edu === Summary === * Completed 45 C on Fringe * Completed Successful Moller === Recen...")
Contents
RC Report
- https://logbooks.jlab.org/entry/4140085
- RC: Zeke Wertz ewertz@wm.edu
Summary
- Completed 45 C on Fringe
- Completed Successful Moller
Recent Issues
- None
Current Status
- Target Studies
Run Plan
- After this complete Optics
- Prep Hall for Target Replacement
Data Collection and Polarization Status
- 45.027 C of uncorrected charge for this kinematic (52.707 C of corrected charge which is 33% of the plan)
- Last NMR 46.9%
Other Topics/Status Updates
Requested Accesses to the Hall
Don Jones Jessie or Techs?