RC meeting and Run Plan, Saturday November 19th
From SBS wiki
Return to the RC Meeting Calendar
Contents
RC Meeting Information
No RC meeting on Saturday and Sunday
RC Updates
Summary of swing 11/18 - day 11/19
- Continued production run on polarized He3 target @45uA beam current with prescale: ps1=9, ps2=15, ps3=0, ps5=3 and all other -1
- DAQ crashed few times during swing and owl shift, restarted the platform (or xterms) to get it fixed
- Bill worked around the oven temperature to make it more uniform https://logbooks.jlab.org/entry/4087154 , but it seems higher oscillation rate with lower temp variation
- Recent NMR sweep target polarization 45.4% (at 11:50 am) and 45.8% (at 2:40pm) today
Run plan for until tomorrow
- Continue production data taking on polarized He3
- 45uA of beam current | Use ps1=9, ps2=15, ps3=0, ps5=3, rest =-1 | One hour long runs
- Move the target to the pickup coil position, and do NMR sweep around every 3 hours
- Return to step 1
Issues
- DAQ rate dropping during even if beam is on => Expert need to figure out issues and permanent solution
- Dump right Ion chamber cabling needs to be changed => Jerry Kowal will try to fix for short term by changing cable on next longer downtime