RC meeting and Run Plan, Sunday October 2nd
From SBS wiki
Revision as of 12:25, 4 October 2022 by Jonesdc (Talk | contribs) (Created page with "__NOTOC__ Daily_Meetings = RC Meeting Information = Run Coordinator: Donald Jones Location: Counting House Conference Room Time: 3:00PM ==Main topics for discussion==...")
RC Meeting Information
Run Coordinator: Donald Jones
Location: Counting House Conference Room
Time: 3:00PM
Main topics for discussion
- Target cell work (alignment and installation update)
- Laser work
- Magnet tests
- Shift schedule (target operator training/shifts)
- Limited RADCON support over weekend (Doug H.)
Commissioning run plans
- Beam line (1-2 shifts) Sept 30.
- Beam centering and target alignment
- Raster calibration
- BCM and BPM calibration
- Corrector adjustment procedure
- GEMs run plan
- Charge feedback system
- Optics and calibration
- Moller polarimeter (1 shift) Oct 7
- Target commissioning
- Bigbite commissioning (preshower, shower, GRINCH)
- HCal commissioning
Subsystem status reports
- Hall A Status -- Jessie Butler
- Target status/timeline (training?) -- Arun
- Beam line:
- Monitors (calibration) -- Simona
- Correctors -- Bogdan, Iuliia
- Wiki, shift schedule, shift checklist -- Don
- Tentative run plan document -- Bogdan
- Alarms
- Analyzer -- Andrew
- DAQ -- Alex
- HCal -- Jiwan
- Spectrometer magnets -- Jack
- GEMs/Tracking -- Holly
- Are new HV controls, alarms, gas flow monitoring procedures, EPCIS tracking in place?
- Shift checklist ok?
- Shower Calorimeter -- Provakar
- Beam polarization -- Don
Minutes
Laser polarization measurements were completed. Magnetic field measurements good enough for run certificate. Mark sent email to Ed Folts saying things were done and we are ready for beam. Jessie will complete hot checkout during the day shift and then take the hall to Controlled access.