RC meeting and Run Plan, Tuesday January 24th

From SBS wiki
Jump to: navigation, search

Return to the RC Meeting Calendar

RC Meeting Information

Current RC: Iuliia Skorodumina
Time: Daily at 3:30PM
Location: Counting House Conference Room

Remote Connection Details

Summary

Monday Swing (01/23). We were taking production data at 45 uA.

HCal HV alarm, fixed by Zeke (https://logbooks.jlab.org/entry/4115863 and https://logbooks.jlab.org/entry/4115876).

See Bill's logentry, where he specifies EPICS variables to cite for the shift checklist (https://logbooks.jlab.org/entry/4115796). Bill also added new alarms into the Alarm Handler (https://logbooks.jlab.org/entry/4115929).

Charge Asymmetry Measurements from Paul (https://logbooks.jlab.org/entry/4115612 and https://logbooks.jlab.org/entry/4115779).

Swing Shift summary (https://logbooks.jlab.org/entry/4115797).

Tuesday Owl (01/24). A great quiet shift with production running at 45 uA. Owl Shift summary (https://logbooks.jlab.org/entry/4116019).

Tuesday Day (01/24). MCC is doing beam studies and takes beam away at 8:30 am (for about 4 hours). The Hall is going to Controlled Access.


Run plan

  • Tuesday Day (01/24) -> MCC starts beam studies at 8:30 am (for 4 hours) -> We go the Controlled Access.
  • Continue production on pol He3 cell at 45 uA.
  • Moller Measurement? January 30 is a new scheduled date for the Wien angle change because Hall B will not start running until then.

Controlled Access 01/24

  • Sean plans on going to the hall to work on GEMs.
  • Walkthrough starts 11am.

Shift Schedule

Please consider signing up for shifts [1].