RC meeting and Run Plan, Wednesday November 30th

From SBS wiki
Revision as of 16:23, 30 November 2022 by Gayoso (Talk | contribs) (Summary)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Return to the RC Meeting Calendar

RC Meeting Information

Time:at 3:30pm today

  • Location: Counting house conference room

RC Updates

Summary

  • Work in the hall was stopped yesterday per RadCon request due to the time.
  • Target work finished (14:20h)

Short term run plan

  • Start the polarization of the target.
  • (MY SUGGESTION-->maybe obsolete) Starting Day Shift (Thursday).
  • Close the hall (techs)
    • Travis has been working with the checklist since early this morning.
  • Beam preparation


Hall Access

NONE