RC meeting and Run Plan, Wednesday October 12th

From SBS wiki
Revision as of 14:17, 12 October 2022 by Wmhenry (Talk | contribs) (RC Meeting Information)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

RC Meeting Information

Time: Daily at 3:00pm

  • Location: Counting house conference room

Useful Links

Current Status

  • Finished with 1-pass beam
  • Reconfiguration, cell install, field measurements will take until Friday DAY

Current Run Plan

  • Pass Change on Friday

Notices in Effect for Shift Crew

  • Power down SBS, BB, and Detector HV before controlled access and allowing RadCon in the hall

Current Issues

  • Getting BigBite to 29.5 degrees
  • Shift Openings


Planned Accesses to the Hall

Special Requests

  • Fix coffee machine, or replace.