Difference between revisions of "Daily Meetings"

From SBS wiki
Jump to: navigation, search
(Created page with "Editing Daily Meetings Back to Main Page == Logistic information == Time: Daily at 3:15pm Location: Counting house conference room <br> BlueJeans c...")
 
Line 16: Line 16:
 
== Standing Agenda ==
 
== Standing Agenda ==
  
# RC Status Report - https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit?usp=sharing
+
# RC Status Report  
 
# Subsystem status reports  
 
# Subsystem status reports  
#* Integrating DAQ
+
#*  
#* Counting DAQ
+
#* Hall A Status -- Jesse Butler
#* Main detectors
+
#* DAQ
#* SAMs
+
#* HCal
#* AT
+
#*Spectrometer magnets
#* PQB
+
#* GEMs/Tracking
 +
#* Shower Calorimeter
 
#* Beam Monitors
 
#* Beam Monitors
 
#* Dithering
 
#* Dithering
 
#* Target
 
#* Target
#* WAC
+
#* Data quality
#* Compton
+
 
#* Shifts
 
#* Shifts
#** [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=PREX/CREX Shift schedule]
+
#** [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=GMn-2021 Shift schedule]
#** [https://docs.google.com/spreadsheets/d/1XL5UY-VVrMkUwjbNzQ7xb6f4rYyqHwUpd034jckEjq0/edit#gid=662941510 Analysis shifts]
+
 
#* Other
 
#* Other
 
# [[RunPlanDaily | Daily Run Plan]]
 
# [[RunPlanDaily | Daily Run Plan]]
Line 41: Line 40:
  
 
Short term (today):
 
Short term (today):
Day/swing-Moller lock, optics check, adiabatic damping, (ffb?),  
+
Day/swing- TBD,  
Swing/owl-Find chole and make sure same position as before, sieve in Ca48 run, detector alignment check, Q2. Stop by 6:30am.
+
Swing/owl- TBD
  
 
Longer term plan:
 
Longer term plan:
  
 
Accelerator Tasks:
 
Accelerator Tasks:
 
Group 1:
 
  1. Moller lock
 
  2. Vwein/solenoid adjustment for vertical transverse
 
  3. Spin Dance
 
  4. VWein/solenoid fine tune optimization to minimize v. transverse for both flip right and flip left at new HWein angle.
 
 
Group 2:
 
  1. Damping test, Matching improvement
 
  2. Tune beam for low backgrounds through the Compton chicane
 
  3. FFB commissioning
 
 
Group 3:
 
  1. Spot size
 
  2. Phase Advance
 
 
————————————————
 
Hall Tasks:
 
Restarting in hall:
 
 
*- check target position and raster size using spot++ and carbon hole
 
* we should start with counting run using VDCs and downstream detectors (careful setup/backout, but no access required)
 
* remember safeguards
 
    o ramp rate <10uA/sec (in small steps or slower if necessary)
 
    o run at collimator center, but verify target is where we expect (or else, framehunt to be certain)
 
    o keep an eye of dp / Teifenbach measurement
 
 
 
Soon we need:
 
————————————————
 
*- pulsed beam synch check
 
*Low current -> high current cavities
 
* Sieve IN Ca-48 counting run (to hunt inelastic cross-sections)
 
*Recheck of det alignment
 
*another Q2 measurement
 
[[Category:Meetings]][[Category:Task List]]
 
 
Summary:
 
This is a minor edit  Watch this page
 
Please note that all contributions to PREX Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
 
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see PREX Wiki:Copyrights for details). Do not submit copyrighted work without permission!
 
 
  Cancel | Editing help (opens in new window)
 
Navigation menu
 
page discussion edit history move watch
 
Jonesdc talk preferences watchlist contributions log out
 
navigation
 
Main page
 
Recent changes
 
Random page
 
Help
 
search
 
Search
 
 
 
tools
 
What links here
 
Related changes
 
Upload file
 
Special pages
 
Page information
 
Powered by MediaWiki
 
Privacy policy About PREX Wiki Disclaimers
 

Revision as of 14:34, 22 July 2021

Editing Daily Meetings


Back to Main Page

Logistic information

 Time: Daily at 3:15pm
 Location:   Counting house conference room
 
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 256 205 934 Bluejeans link: https://bluejeans.com/256205934

Standing Agenda

  1. RC Status Report
  2. Subsystem status reports
    • Hall A Status -- Jesse Butler
    • DAQ
    • HCal
    • Spectrometer magnets
    • GEMs/Tracking
    • Shower Calorimeter
    • Beam Monitors
    • Dithering
    • Target
    • Data quality
    • Shifts
    • Other
  3. Daily Run Plan

To Do

Short term (today): Day/swing- TBD, Swing/owl- TBD

Longer term plan:

Accelerator Tasks: