RC meeting and Run Plan, Sunday November 21th

From SBS wiki
Revision as of 15:12, 21 November 2021 by Brads (Talk | contribs) (Run Plan for When Beam Returns (Tuesday OWL or Wednesday))

Jump to: navigation, search

Daily_Meetings

RC Meeting Information

RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934

Current RC: Brad Sawatzky

Accelerator and Hall Status

  • Hall A remains in Controlled Access, but is ready for beam (see 4th pass separator comments below).
  • GEM and Grinch experts have made a few short accesses for opportunistic debugging while we're down.
  • 4th pass separator has prevented beam to Hall A since Wed afternoon.
    • RF Separator work was unsuccessful as of 3pm Friday. PD Update: 4th Pass IOT
    • Work on the 4th pass IOT has continued over the weekend. However, latest word is that no solution will be available until at least late-day shift on Monday (and that is still a little unclear). So, stay tuned...
    • There will be an interruption to all Halls when OPS is ready to try bringing the 4th pass separator back online.

Plans for the next few days

  • Hall A will move to Restricted Access at ~7am Monday morning for the configuration change to SBS-11
    • We will need to ensure that HVs are off and that it is safe for Techs to work on BB and SBS.
    • The change-over will happen over Monday and Tuesday and will require considerable work around the detector stacks and pivot
    • Hall A Technical staff has priority in that area
    • RadCon, Survey & Alignment are contacted and ready to go
    • We plan to complete the work by the end of Day shift on Tuesday.
  • Depending on how stable the beam is to Hall C over the weekend, we are hoping to shift the pass change to Tuesday Swing (instead of Wed Day).
    • Final decision on this will be made on Monday
    • Shift Leaders have been notified that their shifts are cancelled through Tuesday OWL shift.
    • Tuesday DAY shift personnel should come in as planned. The Tuesday DAY shift leader is free to arrive at noon if he would prefer.

Additional details in sub-section notes below.

Run Plan for When Beam Returns (Tuesday Evening or Wednesday)

  • Beam restoration to the Hall
    • Start with Sieve IN or OUT?
    • Ensure target is OUT
    • GEM HVs OFF
    • SBS, BB OFF
    • All other systems should be ready to go
  • After initial steer-up into Hall is complete
    • Verify beam profile with Harp scans
    • Ramp BB and SBS to production currents
    • Determine raster size and position on target
  • Low current GEM runs (?)
    • 1 uA on LH2
    • Take ____ 5 min long runs with different GEM HV settings for quick voltage scan (needs details)
    • Take 1 30 min long run with the all GEMs at standard voltages to support track reconstruction checkout
  • Move to Production Running cycle
    • [UPDATE ME]
  • Upcoming shift schedule issues https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=GMn-2021
    • Several open TO positions starting Nov 24
    • John Arrington's Tuesday Swing shift is marked 'Trade Requested', but he's been confirmed.
    • Shift Leaders have been notified that their shifts are cancelled through Tuesday OWL shift (during config change)
    • Tuesday DAY shift personnel should come in as planned. The Tuesday DAY shift leader is free to arrive at noon if he would prefer.

Reminders / Notes

  • Role sharing between SL and TO was discussed
    • TO should support the SL wherever possible while still keeping primary focus on the target
      • Beam Time accounting; Shift Checklist tasks are low-hanging fruit
      • Suggestion is to have TO start/stop runs and maintain the Run Log spreadsheet?
  • Run plan communication / documentation will be 'officially' documented on the Daily_Meetings#RC_Meetings page
    • Don has made the Run Coordinator 'Run Plan / Report' page more visible on the wiki (and nicely formatted it)

Subsystem Updates

  • HCal:
    • HCAL timing plots are being updated/corrected
  • BBCal:
    • New HV settings made for upcoming BB/SBS on/off settings
      • Contact BBCal experts to load these if/when needed
    • Corrected BBCal - HCal timing plots (histogram definition errors in prior plots, now fixed)
      • plots make more sense, but more clean-up cuts would likely help -- work continues
    • working on cluster optimization (algorithm modifications in analyzer)
    • Provokar will be out of town in the near future (will be posted on the wiki)
      • Has been working on a number of 'how-to' scripts for experts (Arun, Sebastian, etc)
  • Timing hodoscope:
    • working on RF alignment
    • HV instructions for hodoscope are in the wiki (and also re-posted to halog)
  • Grinch:
    • Study of LED data taken under different BB+SBS conditions underway
    • Maria/Todd/Bradley will be taking some more opportunistic LED pulser data through the weekend
  • GEMS:
    • GEM HV scan using cosmics will be worked on over the weekend
    • Likely still a good idea to do a (quick) 'voltage scan' with beam as well. Details TBD
      • This will be a GEM-expert driven program.
    • Work continues on calibrating/understanding the new GEM layer
  • Beamline:
    • indications that the 'clock' rate used to compute rates from scaler data in each scaler crate (SBS, LHRS) need to be checked
      • Clock value in analyzer likely off by a little in at least one arm
      • David F will go down into the Hall and explicitly measure the rates
      • Resolved: Clock signal rates measured here: https://logbooks.jlab.org/entry/3946822
    • David F is looking at scaler sanity checks with Paul
  • DAQ:
    • General DAQ stability?
      • Frequent crashes at end of run
      • New runs frequently do not start successfully and require cycles of reset/config/reset
    • Alex reports that the LHRS scalers are not gated by the Trigger Supervisor -- will look into it
      • Bob M. and David F. have responded and will be taking care of this
    • ET system issues?
  • Replay analysis:
    • GEM work is ongoing
    • Eric working on end-of-run report file output along with Dave F.
  • Counting House Computer requests
    • Streamline access to common tools (halog, go_* scripts, etc)
      • Get them in a common bin/ directory and added to $PATH?
    • Firefox configurations differ quite a bit depending on user/host
      • Update common configuration to improve useful bookmark toolbar links
      • halog, elog, SBS wiki, Shift crew help, etc
      • 'New' tabs default to something useful, etc