RC meeting and Run Plan, Monday November 22th
From SBS wiki
RC Meeting Information
RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934
Current RC: Brad Sawatzky
Accelerator and Hall Status
- Hall A is in Restricted Access and the configuration change to SBS-11 is underway
- We need to ensure that HVs are off when the Techs are working. They can be turned on for tests during SWING/OWL (check with the RC and make clear Halog entries please!)
- The change-over continue Monday/Tuesday and will require considerable work around the detector stacks and pivot
- Hall A Technical staff has priority in that area
- We plan to complete the work by the end of Day shift on Tuesday.
- GEM and Grinch experts plan to continue opportunistic debugging while we're down.
- 4th pass separator repairs are ongoing. Next opportunity to test the system with power will be Tuesday. This primarily impacts Hall C at this point, but there will be downtimes associated with reintegration and tuning once repairs are completed.
Plans for the next few days
- The pass change has tentatively been moved to Tuesday Swing/OWL (instead of Wed Day) -- assumes reasonable Accelerator uptime Mon/Tuesday!
- Shift Leaders have been notified that their shifts are cancelled through Tuesday OWL shift.
- Tuesday DAY shift personnel should come in as planned. The Tuesday DAY shift leader is free to arrive at noon if he would prefer.
Additional details in sub-section notes below.
Run Plan for When Beam Returns (Tuesday Evening or Wednesday)
To Be Updated...
- Take BBCal cosmics data with magnets on to get HV settings established
- Beam restoration to the Hall
- Start with Sieve IN or OUT?
- Ensure target is OUT
- GEM HVs OFF
- SBS, BB OFF
- All other systems should be ready to go
- After initial steer-up into Hall is complete
- Verify beam profile with Harp scans
- Ramp BB and SBS to production currents
- Determine raster size and position on target
- Low current GEM runs (?)
- 1 uA on LH2
- Take ____ 5 min long runs with different GEM HV settings for quick voltage scan (needs details)
- Take 1 30 min long run with the all GEMs at standard voltages to support track reconstruction checkout
- Move to Production Running cycle
- [UPDATE ME]
- Upcoming shift schedule issues https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=GMn-2021
- Several open TO positions starting Nov 24
- John Arrington's Tuesday Swing shift is marked 'Trade Requested', but he's been confirmed.
- Shift Leaders have been notified that their shifts are cancelled through Tuesday OWL shift (during config change)
- Tuesday DAY shift personnel should come in as planned. The Tuesday DAY shift leader is free to arrive at noon if he would prefer.
Reminders / Notes
- Role sharing between SL and TO was discussed
- TO should support the SL wherever possible while still keeping primary focus on the target
- Beam Time accounting; Shift Checklist tasks are low-hanging fruit
- Suggestion is to have TO start/stop runs and maintain the Run Log spreadsheet?
- TO should support the SL wherever possible while still keeping primary focus on the target
- Run plan communication / documentation will be 'officially' documented on the Daily_Meetings#RC_Meetings page
- Don has made the Run Coordinator 'Run Plan / Report' page more visible on the wiki (and nicely formatted it)
Subsystem Updates
To Be Updated at Today's RC Meeting...
- HCal:
- HCAL timing plots are being updated/corrected
- Will turn off HVs Sunday evening in anticipation Monday's reconfiguration work
- Working on clustering
- BBCal:
- New HV settings made for upcoming BB/SBS on/off settings
- Contact BBCal experts to load these if/when needed
- Corrected BBCal - HCal timing plots (histogram definition errors in prior plots, now fixed)
- plots make more sense, but more clean-up cuts would likely help -- work continues
- working on cluster optimization (algorithm modifications in analyzer)
- Provokar is out of town in the near future (Arun, Sebastian,Scott are taking over)
- Has been working on a number of 'how-to' scripts for experts (Arun, Sebastian, etc)
- New HV settings made for upcoming BB/SBS on/off settings
- Timing hodoscope:
- working on RF alignment
- HV instructions for hodoscope are in the wiki (and also re-posted to halog)
- Grinch:
- Study of LED data taken under different BB+SBS conditions underway
- Maria/Todd/Bradley will be taking some more opportunistic LED pulser data through the weekend
- GEMS:
- GEM HV scan using cosmics will be worked on over the weekend
- Xinzhan will make a log entry outlining work done and a todo list
- Likely still a good idea to do a (quick) 'voltage scan' with beam as well. Details TBD
- This will be a GEM-expert driven program.
- Work continues on calibrating/understanding the new GEM layer
- GEM HV scan using cosmics will be worked on over the weekend
- Beamline:
- indications that the 'clock' rate used to compute rates from scaler data in each scaler crate (SBS, LHRS) need to be checked
- Clock value in analyzer likely off by a little in at least one arm
- David F will go down into the Hall and explicitly measure the rates
- Resolved: Clock signal rates measured here: https://logbooks.jlab.org/entry/3946822
- David F is looking at scaler sanity checks with Paul
- indications that the 'clock' rate used to compute rates from scaler data in each scaler crate (SBS, LHRS) need to be checked
- DAQ:
- General DAQ stability?
- Frequent crashes at end of run
- New runs frequently do not start successfully and require cycles of reset/config/reset
- Maybe VTP library?
- Alex will make a plan for Monday/Tuesday
- Alex reports that the LHRS scalers are not gated by the Trigger Supervisor -- will look into it
- Bob M. and David F. have responded and will be taking care of this [Fixed, thanks Bob]
- L-HRS scaler gate tied to trigger supervisor (TS) now
- ET system issues/status
- Part of the run-start hangs?
- New CODA software ready for roll-out from DA?
- General DAQ stability?
- Replay analysis:
- GEM work is ongoing
- Eric working on end-of-run report file output along with Dave F.
- Counting House Computer requests [Ole?]
- Streamline access to common tools (halog, go_* scripts, etc)
- Get them in a common bin/ directory and added to $PATH?
- Firefox configurations differ quite a bit depending on user/host
- Update common configuration to improve useful bookmark toolbar links
- halog, elog, SBS wiki, Shift crew help, etc
- 'New' tabs default to something useful, etc
- Streamline access to common tools (halog, go_* scripts, etc)