First beam into the hall

From SBS wiki
Revision as of 12:15, 22 September 2022 by Simona (Talk | contribs)

Jump to: navigation, search

https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1186

No target tasks

  • If target work remains to be done in the enclosure before lock up, it's best to run with no target for as long as possible to adhere to the ALARA practice
  • Empty target clearance: 1 inch ideal between reference cell and target foils; we will know the exact number after survey.

From Ellen: "The ideal "No target" clearance is 1 in. It should be something close to that, but may change by a bit depending on where the reference cell ends up when they install it. There is also a small amount of error on the motor positioning, which I will have a better number for after the next survey, but shouldn't be more than 100 microns or so."