RC meeting and Run Plan, Monday September 26th

From SBS wiki
Revision as of 13:06, 26 September 2022 by Jonesdc (Talk | contribs) (Created page with "__NOTOC__ Daily_Meetings = RC Meeting Information = Run Coordinator: Donald Jones Location: Counting House Conference Room Time: 3:00PM ==Counting House status==...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Daily_Meetings

RC Meeting Information

Run Coordinator: Donald Jones

Location: Counting House Conference Room

Time: 3:00PM


Counting House status

Subsystem status reports

  • Hall A Status -- Jesse Butler
  • Target status/timeline (training?) -- Arun
  • Beam line:
    • Monitors (calibration) -- Simona
    • Correctors -- Bogdan, Iuliia
  • Tentative run plan document -- Bogdan
  • Alarms
  • Analyzer -- Andrew
  • DAQ -- Alex
  • HCal -- Jiwan
  • Spectrometer magnets -- Jack
  • GEMs/Tracking -- Holly
    • Are new HV controls, alarms, gas flow monitoring procedures, EPCIS tracking in place?
    • Shift checklist ok?
  • Shower Calorimeter -- Provakar
  • Beam polarization -- Don

Minutes

We had a short meeting. Jack reported that the SBS magnet tripped at 90% and likely required replacement SRCs. This might take a while since he doesn't have any onsite. Alex says the DAQ is working. Holly says the alarm handler is working but folks should let her know if more things need to be added. Simona is continuing to perfect the run plan for bringing beam safely and establishing the raster. The laser system has not received its final inspection and approval. Likely Monday. Jack will continue testing the magnets. When he is done, Todd and co. will continue preparing the target ladder. Tuesday we are expecting to have survey of the target.