RC meeting and Run Plan, Monday November 7th

From SBS wiki
Revision as of 09:52, 7 November 2022 by Sseeds (Talk | contribs) (Open Issues)

Jump to: navigation, search

Return to the RC Meeting Calendar

RC Meeting Information

Time:at 3:30pm today

  • Location: Counting house conference room

Useful Links

Current Status

Hall Status

  • Hall in restricted access for survey and alignment, follow-up items, and checks.
    • Adjustments to SBS, BB, and HCal as necessary
    • Installation of beamline braces, BB hard stops, and GEM electronics shielding
    • Access to BPM crates for final IPM1H04A correction and validation

Open Issues

  • IPM1H04A and IPM1H04E are fixed and signals are tested. Accelerator and hall both have what they need. See log.

Polarized Target

  • Current Polarization: N/A (Target not installed at present)
  • Hourly screenshots suspended until target installation. Lasers locked out.

Subsystems

  • Any Updates?

Future Plans

  • Hall in restricted access for remainder of configuration change
    • Hall access is open to subsystem experts after 1700 and before 0800
    • Please check with RC for access beyond DAQ bunker during the day

Shifts and Meetings

  • Shift leader and target operator shifts are on stand-by for the weekend. At this stage, we will require SL and TO to return Monday Owl, but SL will likely be put on stand-by through Monday.
  • Shall we conduct RC meetings over the weekend?

Other Topics

Experimental progress (for MCC planning meeting)

  • 6.1% of accumulated charge for PRODUCTION data (13.55 Coulombs out of 232)
  • 28% Experimental run time (40 out of 141 days)

Run Plan After Configuration Change

May need updated 'standard' run plan for 3-pass data taking.

So far...

NMR measurement

Restore beam

Run Plan

  • 1.) He-3 runs, at 45uA of beam current. Use ps3==0, ps5=12, all others -1. Take four runs that should each last for one hour.
  • 2.) Move the target to the pickup coil position, and the TO should run an NMR sweep to measure the polarization.
  • 3.) Return to step 1.)
  • Keep an eye out for drifting BPM positions
  • Log all DAQ crashes in the excel worksheet along with the reason for the crash
  • If beam has been down due to accelerator issues perform a checkout of the beam profile by doing harp scans and check beam centering on target using the Carbon hole target, see Simona's procedure: [1], If in doubt about whether you should go through the beam checkout procedure, call this number: 7578693131.
  • Cross check the rate with what is expected: [2]
  • Cross check with the expected ion chamber readings: [3]

Notices in Effect for Shift Crew

Be sure to follow these procedures:

Shifts and Long Term Issues

  • Shift Openings: Wednesday OWL, Thursday OWL. [4]

Planned Accesses to the Hall

In Restricted Access. Configuration change ongoing.

Special Requests

Any special requests?