RC meeting and Run Plan, Monday November 7th
From SBS wiki
Return to the RC Meeting Calendar
Contents
RC Meeting Information
Time:at 3:30pm today
- Location: Counting house conference room
- Join ZoomGov Meeting
- https://jlab-org.zoomgov.com/j/1619032184?pwd=aWhTVWxya1ZZQzA1K2ZPSTd2ZX...
- Meeting ID: 161 903 2184
- Passcode: 260715
- Dial by your location
- +1 669 254 5252 US (San Jose)
- +1 646 828 7666 US (New York)
- +1 551 285 1373 US
- +1 669 216 1590 US (San Jose)
- 833 568 8864 US Toll-free
- Find your local number: https://jlab-org.zoomgov.com/u/acj3pTicMx
Useful Links
Current Status
Over the Weekend
- Jessie and team rotated the Helmholtz coils, installed the beamline, and moved SBS.
- The variac controllers for the oven were replaced and tested by Ellen and Todd.
- We went to CANS and the Hunter and the target group aligned the lasers.
- Bill took some additional SBS/BB off coil field measurements.
Hall Status
- Hall in restricted access for survey and alignment, follow-up items, and checks.
- Adjustments to SBS, BB, and HCal as necessary.
- Installation of beamline braces, BB hard stops, and GEM electronics shielding.
- Access to BPM crates for final IPM1H04A correction and validation.
Open Issues
- IPM1H04A and IPM1H04E are fixed and signals are tested. Accelerator and hall both have what they need. See log.
Polarized Target
- Current Polarization: N/A (Target not installed at present)
- Hourly screenshots suspended until target installation. Lasers locked out.
Subsystems
- Any Updates?
Future Plans
- Hall currently in restricted access until S&A is complete.
- Following S&A, we will move to power permit to conduct field measurements with SBS and BB on.
- Target installation will follow field measurements and be conducted into Tuesday owl. TO is expected to be on-site.
Shifts and Meetings
- Shift leader is on stand-by through Tuesday owl.
Other Topics
Experimental progress (for MCC planning meeting)
- 6.1% of accumulated charge for PRODUCTION data (13.55 Coulombs out of 232)
- 30% Experimental run time (43 out of 141 days)
- Long term "to do" items; not urgent, some can be done when 3He target not available
- Luminosity scans with GEMs
- Opportunistic BCM calibration (higher current) before pass change?
- INFN LV Scan and DAQ Stability - maybe 20-30 minutes if nothing else can run
- Work and testing on LV supplies was performed during opportunistic access. See log.
- Misc. GEM commissioning items: https://sbs.jlab.org/wiki/index.php/CommissioningPlan#BB.2FSBS_GEM_Commissioning_.28Continuation.29
Run Plan After Configuration Change
May need updated 'standard' run plan for 3-pass data taking.
So far...
NMR measurement
Restore beam
Run Plan
- 1.) He-3 runs, at 45uA of beam current. Use ps3==0, ps5=12, all others -1. Take four runs that should each last for one hour.
- 2.) Move the target to the pickup coil position, and the TO should run an NMR sweep to measure the polarization.
- 3.) Return to step 1.)
- Keep an eye out for drifting BPM positions
- Log all DAQ crashes in the excel worksheet along with the reason for the crash
- If beam has been down due to accelerator issues perform a checkout of the beam profile by doing harp scans and check beam centering on target using the Carbon hole target, see Simona's procedure: [1], If in doubt about whether you should go through the beam checkout procedure, call this number: 7578693131.
- Cross check the rate with what is expected: [2]
- Cross check with the expected ion chamber readings: [3]
Notices in Effect for Shift Crew
Be sure to follow these procedures:
- Power down SBS, BB, and Detector HV before controlled access and allowing RadCon in the hall
- Communicate to the TO that the SBS and BB magnets will be powered down, so they can update the holding field
- See the beam recovery procedures at: HOW_TOs#Beam_Recovery_Procedure
- See the instructions to set the raster at: HOW_TOs#How_to_ask_MCC_to_set_the_desired_raster_size_of_6_mm
Shifts and Long Term Issues
- Shift Openings: Wednesday OWL, Thursday OWL. [4]
Planned Accesses to the Hall
In Restricted Access. Configuration change ongoing.
Special Requests
Any special requests?