RC Meeting Information

Time:at 3:30pm today

  • Location: Counting house conference room

Useful Links

Current Status

Over the Weekend

  • Jessie and team rotated the Helmholtz coils, installed the beamline, and moved SBS.
  • The variac controllers for the oven were replaced and tested by Ellen and Todd.
  • We went to CANS and the Hunter and the target group aligned the lasers.
  • Bill took some additional SBS/BB off coil field measurements.

Hall Status

  • Hall in restricted access for survey and alignment, follow-up items, and checks.
    • Adjustments to SBS, BB, and HCal as necessary.
    • Installation of beamline braces, BB hard stops, and GEM electronics shielding.
    • Access to BPM crates for final IPM1H04A correction and validation.

Open Issues

  • IPM1H04A and IPM1H04E are fixed and signals are tested. Accelerator and hall both have what they need. See log.

Polarized Target

  • Current Polarization: N/A (Target not installed at present)
  • Hourly screenshots suspended until target installation. Lasers locked out.

Subsystems

  • Any Updates?

Future Plans

  • Hall currently in restricted access until S&A is complete.
  • Following S&A, we will move to power permit to conduct field measurements with SBS and BB on.
  • Target installation will follow field measurements and be conducted into Tuesday owl. TO is expected to be on-site.

Shifts and Meetings

  • Shift leader is on stand-by through Tuesday owl.

Other Topics

Experimental progress (for MCC planning meeting)

  • 6.1% of accumulated charge for PRODUCTION data (13.55 Coulombs out of 232)
  • 30% Experimental run time (43 out of 141 days)

Run Plan After Configuration Change

May need updated 'standard' run plan for 3-pass data taking.

So far...

NMR measurement

Restore beam

Run Plan

  • 1.) He-3 runs, at 45uA of beam current. Use ps3==0, ps5=12, all others -1. Take four runs that should each last for one hour.
  • 2.) Move the target to the pickup coil position, and the TO should run an NMR sweep to measure the polarization.
  • 3.) Return to step 1.)
  • Keep an eye out for drifting BPM positions
  • Log all DAQ crashes in the excel worksheet along with the reason for the crash
  • If beam has been down due to accelerator issues perform a checkout of the beam profile by doing harp scans and check beam centering on target using the Carbon hole target, see Simona's procedure: [1], If in doubt about whether you should go through the beam checkout procedure, call this number: 7578693131.
  • Cross check the rate with what is expected: [2]
  • Cross check with the expected ion chamber readings: [3]

Notices in Effect for Shift Crew

Be sure to follow these procedures:

Shifts and Long Term Issues

  • Shift Openings: Wednesday OWL, Thursday OWL. [4]

Planned Accesses to the Hall

In Restricted Access. Configuration change ongoing.

Special Requests

Any special requests?