RC meeting and Run Plan, Sunday November 20th

From SBS wiki
Revision as of 13:31, 20 November 2022 by Jpoudel (Talk | contribs) (Created page with "Return to the RC Meeting Calendar = RC Meeting Information = '''No RC meeting today''' = RC Updates = ===Summary of swing 11/19 - day 11/20=...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Return to the RC Meeting Calendar

RC Meeting Information

No RC meeting today

RC Updates

Summary of swing 11/19 - day 11/20

  • Continued production run on polarized He3 target @45uA beam current with prescale: ps1=9, ps2=15, ps3=0, ps5=3 and all other -1
  • Target polarization 45.8% (yesterday at 5:45pm) and 48.6% (today at 11:59 am)

Run plan for until tomorrow

  • Continue production data taking on polarized He3
  1. 45uA of beam current | Use ps1=9, ps2=15, ps3=0, ps5=3, rest =-1 | One hour long runs
  2. Move the target to the pickup coil position, and do NMR sweep around every 3 hours
  3. Return to step 1

Issues

  • Dump right Ion chamber cabling needs to be changed => Jerry Kowal will try to fix for short term by changing cable on next longer downtime