RC meeting and Run Plan, Sunday December 4th
From SBS wiki
Return to the RC Meeting Calendar
Contents
RC Meeting Information
No Meeting, Have a nice weekend!
Announcement
Bill will host a target training session on Next Monday after the RC meeting, we have lots of TO shifts open, please take the chance join the session
Shift Schedule
https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=SBS-GEn-2022
Current Status
- Very smooth production run on He3 target @ 36 uA. No big interruptions.
- NMR polarization -
- During Saturday Swing shift, MCC temporarily dropped us to 30 uA due to RF instability issue, I checked with MCC, confirmed that this is only temporarily, as long as they have a better RF stability, they will bring us back to 36 uA.
- Jiwan, Alexander, Bryan and Ben traced down to the cause of the HCal f1TDC 1 & 4 timing shift issue (see a log https://logbooks.jlab.org/entry/4095193 ), Up to now, this issue only shows up in a single run 3005, Jiwan put a specific instruction on what to do when we encounter this issue again. We will keep an eye on this.
- Target
- There are a few runs with 50 K replay missing SBS GEMs plots due to the over-sized pdf file, which blocked them being posted to logbook, Sean reduced the pdf file size by removing a few histograms, the later runs seems fine since then.
- For future shift takers, MCC gave us an option for checking beam restoration status, please check a detailed description in a log by Iullia [ https://logbooks.jlab.org/entry/4094990 ]
Short Term Run Plan
- Continue production run on He3 target, 36 uA
- Use GEnII-3stream DAQ config
- Use ps3=0, ps5=6, others =-1
- BBCal threshold at -366 mV, HCal threshold at -19 mV
- NMR measurement every 2 hours
Current Issues
- BB Hodoscope: channel 0R - 15R missing in the 50K replay [ https://logbooks.jlab.org/files/2022/12/4093673/summaryPlots_2966_BBTH.pdf ]
- One APV malfunction, not a big problem
Planned Accesses to the Hall
- Will try to arrange an escorted access for fixing hodoscope when we have a long beam down ( longer than 1 hour).
Special Requests
- None
Notices in Effect for Shift Crew
- Power down SBS, BB, and Detector HV before making an access to the Hall