Until Shutdown

All shifts are full! :)

Accelerator Status

  • Accelerator was down at the end of SWING for 45 minutes. [DT Event ID: 17472]
  • Hall C valve/vacuum repair is complete; they're coming back online Tuesday; they will be priority hall next week.

Current Status

Taking production data on 3-He

Shift Summaries

Things That Happened

  • HH Hodoscope voltages dropped on Sunday OWL (IDK, if this is wholly unusual). [4099867]
  • Scalar helicity histogram from run 3191 50K Replay showed all zeros. [4099876]
    • This was about 30 minutes of lost data.
    • I only found one HALOG post while talking to SL, advised SL to start new run when accelerator returned beam and verify helicity data correct.
    • SL should make reviewing 50K plots high priority.

Beam Current

We've been happily running at 40uA.

  • (Saturday) I asked Sebastian to make a record of the ramp rates over the course of the past 8 hours during Saturday SWING and he went an extra step. [4099752]
  • (Sunday) Bill has taken this further and created a strip chart that tracks this continually that seems to work very nicely. [4099956}

Target

Target polarization has been stable. List of the recent polarizations

Target Operator issues:

  • (Sunday) Bill noticed that the wrong laser software was running on polhe1; he corrected the issue. [4100010]
  • Junhao has complained that the Windows target VNC screen keeps locking, this is a nuisance. [4100065]

Issues Resolved

  • Bill Henry has resolved the communication issue regarding the Moller HH magnet. Thank you, Bill. [4099942]
  • Bill spoke with Zeke about GEM RED alarm panel items about this and they agreed to bring the topic up in Monday's RC Meeting.

Issues remaining

  • BB GEM APV unreachable and cannot be repaired at this time.

Short Term Run Plan

  • Continue production run on He3 target, 40 uA
  • Use GEnII-noSBSGEMs DAQ config
  • Use ps3=0, ps5=6, others =-1
  • BBCal threshold at -366 mV, HCal threshold at -19 mV
  • NMR measurement every 3 - 4 hours, close to 4 hours is better

Planned Accesses to the Hall

None

Special Requests

Please email me ericking (@jlab.org or @temple.edu) if there's something to be added.

Notices in Effect for Shift Crew

  • Power down SBS, BB, and Detector HV before making an access to the Hall

Data Collection Status

  • 77 out of 141 days (~54.6%)
  • (NEEDS TO BE UPDATED) Total uncorrected accumulated charge on He3: 53.937 C out of 232C (23.25%)
    • 2-Pass: 13.467 C
    • 3-Pass: 40.470 C (@ end of SUNDAY DAY)