RC meeting and Run Plan, Saturday February 4th

From SBS wiki
Revision as of 12:30, 5 February 2023 by Rmontgom (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Return to the RC Meeting Calendar

RC Report

Summary

  • On-going production running with polhe3 and 45uA.
  • Since yesterday morning shift crews have collected of 2.5C of uncorrected charge (3.1C of corrected charge).
  • Current target polarisation is 49.4%, and it hit 52.3% yesterday evening after ~24hrs of production running.

Current Status

  • Production running polhe3.

Run Plan

  • Continue production running at 45uA and polHe3

Data Collection and Polarisaton Status

  • Accumulated charge uncorrected 22.7C; accumulated charge corrected 24.58C
  • Current target polarisation 49.4%

Other Topics/Status Updates

  • MCC are talking about recovery day Tue next week and accelerator tuning Thursday next week. Not cemented plans, will update when hear more.

Shift Schedule

Requested Accesses to the Hall

  • Looking to put SBS GEMs in DAQ during day shifts, need to fix a cable in Hall first
  • Target team for oven heater check

Special Requests

  • DC power did not access Hall during maintenance day for moeller magnet, would be good to coordinate in the future.

Notices for Shift Crew

  • Check the How To page
  • Pay attention to beam restoration procedures in the How To
    • there is a procedure if beam has been away for 30minutes, and another procedure if machine has been down for tuning or something which may change beam profile. Communicate with MCC to figure out why beam has been down and to figure out which kind of restoration you should do.
  • SL:
    • production runs (1-1.5hr) and replays (50k replay for each run, ~two runs also with 200k replays per shift if possible)
  • TOs:
  • Contact RC any time for any questions

Useful Links