RC meeting and Run Plan, Friday February 17th

From SBS wiki
Revision as of 10:33, 17 February 2023 by Bogdanw (Talk | contribs) (Data Collection and Polarization Status)

Jump to: navigation, search

Return to the RC Meeting Calendar


RC Report

Summary

  • Ran with ~30 uA beam overnight increasing to 40 uA
  • Average current was just 12 uA (8am/16 - 8am/17) => 1 C only

Issues

  • CEBAF beam delivery efficiency

Current Status

  • Production on polarized He-3 target

Run Plan

  • Continue running 45 uA on He3
  • Accelerator will prioritize beam and not have any maintenance days this week

Data Collection and Polarization Status

  • 34.2C of uncorrected charge for this kinematic (40.1C of corrected charge)
  • Last NMR 52.4%

Other Topics/Status Updates

  • BBcal PS multiplicity reduced?
  • HCal missing channels during swing shift?
  • Anything else?
  • Bill wants to change the raster settings after some analysis

Requested Accesses to the Hall

  • Jack would like to collect some cables