RC meeting and Run Plan, Thursday March 2nd
From SBS wiki
Revision as of 16:21, 2 March 2023 by Billlee (Talk | contribs) (Created page with "Return to the RC Meeting Calendar === RC Report === * RC: Wenliang (billlee) Li, billlee@jlab.org === Summary === * Target installation * Op...")
Return to the RC Meeting Calendar
Contents
RC Report
- RC: Wenliang (billlee) Li, billlee@jlab.org
Summary
- Target installation
- Optics
- Spot Spot
Recent Issues
- No beam
Current Status
- No beam
Run Plan
- Beam restoration
- Harp Scane
- Spot check
- 40uA production (may be lower)