RC meeting and Run Plan, Thursday March 2nd

From SBS wiki
Revision as of 16:21, 2 March 2023 by Billlee (Talk | contribs) (Created page with "Return to the RC Meeting Calendar === RC Report === * RC: Wenliang (billlee) Li, billlee@jlab.org === Summary === * Target installation * Op...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Return to the RC Meeting Calendar

RC Report

  • RC: Wenliang (billlee) Li, billlee@jlab.org

Summary

  • Target installation
  • Optics
  • Spot Spot


Recent Issues

  • No beam

Current Status

  • No beam

Run Plan

  • Beam restoration
    • Harp Scane
    • Spot check
  • 40uA production (may be lower)

Data Collection and Polarization Status

Other Topics/Status Updates

Requested Accesses to the Hall