Daily Meetings

From SBS wiki
Revision as of 14:26, 22 July 2021 by Jonesdc (Talk | contribs) (Created page with "Editing Daily Meetings Back to Main Page == Logistic information == Time: Daily at 3:15pm Location: Counting house conference room <br> BlueJeans c...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Editing Daily Meetings


Back to Main Page

Logistic information

 Time: Daily at 3:15pm
 Location:   Counting house conference room
 
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 256 205 934 Bluejeans link: https://bluejeans.com/256205934

Standing Agenda

  1. RC Status Report - https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit?usp=sharing
  2. Subsystem status reports
  3. Daily Run Plan

To Do

Short term (today): Day/swing-Moller lock, optics check, adiabatic damping, (ffb?), Swing/owl-Find chole and make sure same position as before, sieve in Ca48 run, detector alignment check, Q2. Stop by 6:30am.

Longer term plan:

Accelerator Tasks:

Group 1:

 1. Moller lock
 2. Vwein/solenoid adjustment for vertical transverse
 3. Spin Dance
 4. VWein/solenoid fine tune optimization to minimize v. transverse for both flip right and flip left at new HWein angle.

Group 2:

 1. Damping test, Matching improvement
 2. Tune beam for low backgrounds through the Compton chicane
 3. FFB commissioning

Group 3:

 1. Spot size
 2. Phase Advance

———————————————— Hall Tasks: Restarting in hall:

  • - check target position and raster size using spot++ and carbon hole
  • we should start with counting run using VDCs and downstream detectors (careful setup/backout, but no access required)
  • remember safeguards
    o ramp rate <10uA/sec (in small steps or slower if necessary)
    o run at collimator center, but verify target is where we expect (or else, framehunt to be certain)
    o keep an eye of dp / Teifenbach measurement


Soon we need: ————————————————

  • - pulsed beam synch check
  • Low current -> high current cavities
  • Sieve IN Ca-48 counting run (to hunt inelastic cross-sections)
  • Recheck of det alignment
  • another Q2 measurement

Summary:

This is a minor edit  Watch this page

Please note that all contributions to PREX Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here. You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see PREX Wiki:Copyrights for details). Do not submit copyrighted work without permission!

  Cancel | Editing help (opens in new window)

Navigation menu page discussion edit history move watch Jonesdc talk preferences watchlist contributions log out navigation Main page Recent changes Random page Help search Search

tools What links here Related changes Upload file Special pages Page information Powered by MediaWiki Privacy policy About PREX Wiki Disclaimers