RC meeting and Run Plan, Friday February 10th
From SBS wiki
Return to the RC Meeting Calendar
Contents
RC Report
- https://logbooks.jlab.org/entry/4128217
- RC: Sean Jeffas, sj9ry@virginia.edu
Summary
- Ran with beam most of yesterday, collecting 1.2C
- Beam tripping increased and MCC had to drop us to 30 uA during owl.
- This morning MCC did some beam studies and feels confident that the trips will be reduced now.
- Provakar and Arun investigated the BBCal FIFO but discovered that the upstream summing module is the actual issue. This will take a 1 hour access to fix.
Issues
- BBCal blocks are empty.
- GEM MPD crate needed to be reset a couple times, https://logbooks.jlab.org/entry/4127890
- Hodoscope channel triped off twice, but came back immediately, https://logbooks.jlab.org/entry/4128018
- HCal VTP errors fixed after crate reset, https://logbooks.jlab.org/entry/4128201
Current Status
- Running 45 uA on He3
Run Plan
- Continue running 45 uA on He3
Data Collection and Polarization Status
- 25.2C of uncorrected charge for this kinematic (27.9C of corrected charge)
- Last NMR 52.7%
Other Topics/Status Updates
- Anything else?
Requested Accesses to the Hall
- Arun or Provakar to replace the BBCal summing module
- Jack would like to collect some cables
- GEM team need like a 3-4hour access for the SBS GEMs DAQ troubleshooting