RC Report


Summary

  • Ran with beam most of yesterday, collecting 1.2C
  • Beam tripping increased and MCC had to drop us to 30 uA during owl.
  • This morning MCC did some beam studies and feels confident that the trips will be reduced now.
  • Provakar and Arun investigated the BBCal FIFO but discovered that the upstream summing module is the actual issue. This will take a 1 hour access to fix.

Issues

Current Status

  • Running 45 uA on He3


Run Plan

  • Continue running 45 uA on He3


Data Collection and Polarization Status

  • 25.2C of uncorrected charge for this kinematic (27.9C of corrected charge)
  • Last NMR 52.7%


Other Topics/Status Updates

  • Anything else?


Requested Accesses to the Hall

  • Arun or Provakar to replace the BBCal summing module
  • Jack would like to collect some cables