RC meeting and Run Plan, Friday October 22nd
From SBS wiki
RC Meeting Information
RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934
Accelerator Status
- Down for DAY shift to fix ARC 7
- Beam restoration underway
- Pass Change will happen Sunday 9am
Hall A Status and News
- In controlled access
- Autologging of replay plots is working (https://logbooks.jlab.org/entry/3930257)
- EDTM on at 20 Hz (https://logbooks.jlab.org/entry/3930072)
- GEM premix change over fixed https://logbooks.jlab.org/entry/3929888
Current Run Plan
Subsystem Updates
- HCAL
- BBCal
- Timing Hodoscope
- Grinch
- GEMS
- DAQ
- Replay Analysis
Reminders to shift crew
- Check GEM gas mix every 2 hours
- HALOG GEM efficiency plots e.g. (https://logbooks.jlab.org/entry/3930258)
- Fill Out Run list
Current Issues
- Can we identify pulsar events in HCal? (Ole working on it)
- GEM’s why hits double what we expect ? Factor of two increase. Absorber in front of gems.? Additional shielding around magnet pole.