RC meeting and Run Plan, Monday Sept. 11, 2023
From SBS wiki
Return to the RC Meeting Calendar
Contents
RC Meeting Information
Time:at 3:30pm today
- Location: Counting house conference room
- ZoomGov Meeting Connection Information
https://sbs.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=431
Useful Links
Readiness for Beam
Accelerator readiness:
- CG: beam restoration to hall A projected to start swing Tue Sept 12. I have "un-cancelled" the Wed OWL shift since there is a higher than not probability that the accelerator will be able to deliver CW beam. Bill Henry will be on-call to provide support for the CW portion of the checks (target protection checks, ion chamber checks).
- SSG only has the Moller Target to check; Ellen will work through at least the FSD portion today or tomorrow morning
- ZR: plan to do checklist on Tue (everyone out of the hall by lunch)
- ZR: facilities found that the power cord from the rack to the feeder panel melted; logbook entry incoming; shorted the power cord by ~12feet.
Shift schedule
- CG: OWL on Wed only has a SL; we need a TO
Subsystems Checklist
For each subsystem we ask that the responsible person go over the following points:
- The overall status of your subsystem
- Will your subsystem be ready well before Hall lock-up on Friday or at the latest by Monday morning?
- Does your system being ready depend on your team only or are outside resources required?
Subsystems
- SBS magnet and Bigbite magnets ramp and hold
- works; acid flush rescheduled for the long down
- Corrector magnets:
- complete
- Target status (magnets, measurements, laser, installation, alignment, polarization, power etc)
- Installed on Friday to get it polarized; only got to 20% => laser misaligned (fixed today and polarize tonight)
- Target install: Kate, Arun, Bill currently installing the carbon foils and probably will have to push alignment and laser checks in the morning
- HCal (Jiwan Poudel)
- ready
- doing final checks
- Bigbite (Arun Tadepalli)
- Gary: replaying cosmics run now and will update if something needs fixing;
- Counting House Alarms (Bill Henry)
- Bill tested the alarms and instructions for shift crew response in the wiki (needs further revision?)
- DAQ (Alex Camsonne)
- one channel of GRINCH has an issue (HV tripping -> Eric/Todd). Power supply works. Group of PMTs make the HV trip. Todd is working on it now.
- SBS GEMs are hanging the DAQ (Vimukthi)
- will take another cosmic run tonight
- GEMs (Holly Szumila-Vance)
- Vimukthi: fixed issue with SBS and BB GEMs (LEMO cables was the culprit - logbook still needs to be made) => check on this
- ChG: Ellen has a mass flow controller and needs to find some time to install it (not a show stopper - gas mixture changes from 79%Ar to 70%) => Chandan can also change the MFC; this is outside of the hall can be done later
- Moller polarimeter (Don Jones)
- Target motion not working (Ellen looking into it)
- we want to do at least one measurement at the beginning; all systems that could be checked now (besides the target) work as expected
- magnet should finish cooling by this evening
- Hodoscopes:
- waiting on replay
Preliminary run plan
- First, bring the beam safely into the hall (Beam recovery procedure - Jiwan and William Henry https://sbs.jlab.org/wiki/index.php/HOW_TOs#Beam_Recovery_Procedure)
Q: At what stage is the SBS turned ON? WH: will post links to the corrector checkout
- BigBite/single foil location reconstruction (~20 mins?) - BigBite + HCAL detector experts on call consulting analysis experts like Andrew/Sean (magnet on)
- Target performance assessment by target group - Arun (Why hasn’t the target reached xx% polarization?), tell us when we will get there (Target group - Arun) and plan for those hours in between
- Take production data!
List of items in case target isn’t ready:
- Take data on reference cell at 10 atm H2 (portions that add up to 1 day)
- BigBite Sieve slit
- with 8 carbon foils and take optics for 1 hr at 40 uA (Sean/Andrew - confirm time)
- 1 hour for single foil (magnets off) => Chance BBcal HV setting to appropriate values
- Moller measurement depending on availability of people and results from Hall C
Present
In person: Ciprian G, Alexandre C, Chandan G, Hanjie L, Zak R, Don J, Bill H, Eric F, Jiwan P
Online: Skorodumina, Bogdan W, Jimmy C, Ole H, Gary P, Sanghwa P, Andrew P,