RC meeting and Run Plan, Saturday December 18th
From SBS wiki
RC Meeting Information
Run Coordinator: Bogdan Wojtsekhowski
Location: Counting House Conference Room
Time: was canceled due to weekend
Remote connection link: https://bluejeans.com/256205934
Toll-Free Number (U.S.& Canada): 1-888-240-2560
Bluejeans Meeting ID: 256 205 934
Upcoming Shifts Which Need Filled
Shifts in January need help - 195 openings to fill
Today's estimate: Optic beam Tue. Jan 11, "Bonus beam" Jan 12-16. Official beam Jan 17
Accelerator and Hall Status
- Preparation for beam off period
- End of beam: Tue. Dec. 21 at 7:00 AM
- Tuesday 12/21 at 8pm expected test of the Access Control System for one hour
To be Done During Extended Down Time
- Replace J0 INFN plane with UVa plane UV#4 and related electronics
- Spectrometers positions for SBS-14 kinematics
- Cosmic tests of HCal and BBcal
- Study of GRINCH
Run Plan
- Low current runs on Dummy for GEM efficiency test
- Continue with "Cycle 23"
- Continue the cycle pattern
Opportunistic Access Completed
- None
Resolved Issues
- Oscilloscope on SL monitor for instant check of the delays
- GEM sector loss => reduce HV by 25 V on all GEMs
Unresolved Issues
- NEW: HCAL ROC17 ERROR for last 12+ hours
- Occasional timing shifts of ~70 ns
- GEM efficiency analysis.
- Use of the Y-tgt cut for determination of the actual efficient of the detector.
Subsystem Updates
- DAQ general
- Alex update
- HCal
- F1 errors (HCal sync errors)... Don't ignore!! End, Reset(twice?), Configure, Download. If that doesn't work, call DAQ on call.
- Prints of good HCal plots for LH2 and LD2 target Sebatian put on the SL table.
- BBCal
- no update. Problem with BBcal HV for last few hours.
- Timing Hodoscope
- no update
- GRINCH
- Maria presented the ADC spectra with a single PE peak from actual GMn data!
- GEMS
- DAQ update
- HV and efficiency status: Kondo will take data with dummy target at two HV values.
- Beamline
- David continue data analysis.
- Replay analysis
- Andrew update and results
- Massive data replay: script preparation is in progress.