RC meeting and Run Plan, Saturday November 20th

From SBS wiki
Jump to: navigation, search

Daily_Meetings

RC Meeting Information

NO RC meeting on Saturday

Current RC: Brad Sawatzky

Accelerator and Hall Status

  • Hall A remains in Controlled Access, but is ready for beam (see 4th pass separator comments below).
  • GEM and Grinch experts have made a few short accesses for opportunistic debugging while we're down.
  • 4th pass separator has prevented beam to Hall A since Wed afternoon.
    • RF Separator work was unsuccessful as of 3pm Friday. PD Update: 4th Pass IOT
    • Work on the 4th pass IOT has continued over the weekend. However, latest word is that no solution will be available until at least late-day shift on Monday (and that is still a little unclear). So, stay tuned...
    • There should expect an interruption to all Halls when OPs is ready to try bringing the 4th pass separator back online.

Plans for the next few days

  • Hall A will not be receiving beam this weekend.
    • TOs must come in as planned to monitor the target and provide a point of contact in the Counting House
    • Shift Leaders have been notified that their shifts are cancelled through Tuesday OWL shift.
    • Tuesday DAY shift personnel should come in as planned. The Tuesday DAY shift leader is free to arrive at noon if he would prefer.
  • We will continue with the BB and SBS configuration change first thing Monday morning.
    • Since we are in Controlled Access already, and have not received beam since the last survey, we will be able to drop to Restricted quickly that morning.
    • We will still need to ensure that HVs are off and that it is safe for Techs to work on BB and SBS.
  • The configuration change to SBS-11 is expected to be complete by the end of Day shift on Tuesday.
  • Depending on how stable the beam is to Hall C over the weekend, we are hoping to shift the pass change to Tuesday Swing (instead of Wed Day).
    • We plan to nail the pass change details down on Sunday (tomorrow).


Additional details in sub-section notes below.


Run Plan for When Beam Returns (Tuesday OWL or Wednesday)

  • Beam restoration to the Hall
    • Start with Sieve IN or OUT?
    • Ensure target is OUT
    • GEM HVs OFF
    • SBS, BB OFF
    • All other systems should be ready to go
  • After initial steer-up into Hall is complete
    • Verify beam profile with Harp scans
    • Ramp BB and SBS to production currents
    • Determine raster size and position on target
  • Low current GEM runs
    • 1 uA on LH2
    • Take ____ 5 min long runs with different GEM HV settings for quick voltage scan (needs details)
    • Take 1 30 min long run with the all GEMs at standard voltages to support track reconstruction checkout
  • Move to Production Running cycle
    • [UPDATE ME]
  • Upcoming shift schedule issues https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=GMn-2021
    • Several open TO positions starting Nov 24
    • Configuration change on Monday-Tuesday (still the plan, but watch for updates!)
      • Will plan to cancel SL shifts starting Monday DAY -- Tuesday DAY; Tuesday SWING shifts will proceed as planned for now (but stay tuned)
      • (Missing SL on Monday, but that is OK due to configuration change)

Reminders / Notes

  • Role sharing between SL and TO was discussed
    • TO should support the SL wherever possible while still keeping primary focus on the target
      • Beam Time accounting; Shift Checklist tasks are low-hanging fruit
      • Suggestion is to have TO start/stop runs and maintain the Run Log spreadsheet?
  • Run plan communication / documentation will be 'officially' documented on the Daily_Meetings#RC_Meetings page
    • Don has made the Run Coordinator 'Run Plan / Report' page more visible on the wiki (and nicely formatted it)

Subsystem Updates

  • Hall Status:
    • Presently in Controlled Access. We will stay in this mode until Monday morning.
  • HCal:
    • HCAL timing plots are being updated/corrected
  • BBCal:
    • New HV settings made for upcoming BB/SBS on/off settings
      • Contact BBCal experts to load these if/when needed
    • Corrected BBCal - HCal timing plots (histogram definition errors in prior plots, now fixed)
      • plots make more sense, but more clean-up cuts would likely help -- work continues
    • working on cluster optimization (algorithm modifications in analyzer)
    • Provokar will be out of town in the near future (will be posted on the wiki)
      • Has been working on a number of 'how-to' scripts for experts (Arun, Sebastian, etc)
  • Timing hodoscope:
    • working on RF alignment
    • HV instructions for hodoscope are in the wiki (and also re-posted to halog)
  • Grinch:
    • Study of LED data taken under different BB+SBS conditions underway
    • Maria/Todd/Bradley will be taking some more opportunistic LED pulser data through the weekend
  • GEMS:
    • GEM HV scan using cosmics will be worked on over the weekend
    • Likely still a good idea to do a (quick) 'voltage scan' with beam as well. Details TBD
      • This will be a GEM-expert driven program.
    • Work continues on calibrating/understanding the new GEM layer
  • Beamline:
    • indications that the 'clock' rate used to compute rates from scaler data in each scaler crate (SBS, LHRS) need to be checked
      • clock value in analyzer likely off by a little in at least one arm
      • David F will go down into the Hall and explicitly measure the rates
      • Resolved: Clock signal rates measured here: https://logbooks.jlab.org/entry/3946822
    • David F is looking at scaler sanity checks with Paul
  • DAQ:
    • Alex reports that the LHRS scalers are not gated by the Trigger Supervisor -- will look into it
      • Bob M. and David F. have responded and will be taking care of this
  • Replay analysis:
    • GEM work is ongoing
    • Eric working on end-of-run report file output along with Dave F.