RC meeting and Run Plan, Saturday November 20th
From SBS wiki
RC Meeting Information
NO RC meeting on Saturday
Current RC: Brad Sawatzky
Accelerator and Hall Status
- Hall A remains in Controlled Access, but is ready for beam (see 4th pass separator comments below).
- GEM and Grinch experts have made a few short accesses for opportunistic debugging while we're down.
- 4th pass separator has prevented beam to Hall A since Wed afternoon.
- RF Separator work was unsuccessful as of 3pm Friday. PD Update: 4th Pass IOT
- Work on the 4th pass IOT has continued over the weekend. However, latest word is that no solution will be available until at least late-day shift on Monday (and that is still a little unclear). So, stay tuned...
- There should expect an interruption to all Halls when OPs is ready to try bringing the 4th pass separator back online.
Plans for the next few days
- Hall A will not be receiving beam this weekend.
- TOs must come in as planned to monitor the target and provide a point of contact in the Counting House
- Shift Leaders have been notified that their shifts are cancelled through Tuesday OWL shift.
- Tuesday DAY shift personnel should come in as planned. The Tuesday DAY shift leader is free to arrive at noon if he would prefer.
- We will continue with the BB and SBS configuration change first thing Monday morning.
- Since we are in Controlled Access already, and have not received beam since the last survey, we will be able to drop to Restricted quickly that morning.
- We will still need to ensure that HVs are off and that it is safe for Techs to work on BB and SBS.
- The configuration change to SBS-11 is expected to be complete by the end of Day shift on Tuesday.
- Depending on how stable the beam is to Hall C over the weekend, we are hoping to shift the pass change to Tuesday Swing (instead of Wed Day).
- We plan to nail the pass change details down on Sunday (tomorrow).
Additional details in sub-section notes below.
Run Plan for When Beam Returns (Tuesday OWL or Wednesday)
- Beam restoration to the Hall
- Start with Sieve IN or OUT?
- Ensure target is OUT
- GEM HVs OFF
- SBS, BB OFF
- All other systems should be ready to go
- After initial steer-up into Hall is complete
- Verify beam profile with Harp scans
- Ramp BB and SBS to production currents
- Determine raster size and position on target
- Low current GEM runs
- 1 uA on LH2
- Take ____ 5 min long runs with different GEM HV settings for quick voltage scan (needs details)
- Take 1 30 min long run with the all GEMs at standard voltages to support track reconstruction checkout
- Move to Production Running cycle
- [UPDATE ME]
- Upcoming shift schedule issues https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=GMn-2021
- Several open TO positions starting Nov 24
- Configuration change on Monday-Tuesday (still the plan, but watch for updates!)
- Will plan to cancel SL shifts starting Monday DAY -- Tuesday DAY; Tuesday SWING shifts will proceed as planned for now (but stay tuned)
- (Missing SL on Monday, but that is OK due to configuration change)
Reminders / Notes
- Role sharing between SL and TO was discussed
- TO should support the SL wherever possible while still keeping primary focus on the target
- Beam Time accounting; Shift Checklist tasks are low-hanging fruit
- Suggestion is to have TO start/stop runs and maintain the Run Log spreadsheet?
- TO should support the SL wherever possible while still keeping primary focus on the target
- Run plan communication / documentation will be 'officially' documented on the Daily_Meetings#RC_Meetings page
- Don has made the Run Coordinator 'Run Plan / Report' page more visible on the wiki (and nicely formatted it)
Subsystem Updates
- Hall Status:
- Presently in Controlled Access. We will stay in this mode until Monday morning.
- HCal:
- HCAL timing plots are being updated/corrected
- BBCal:
- New HV settings made for upcoming BB/SBS on/off settings
- Contact BBCal experts to load these if/when needed
- Corrected BBCal - HCal timing plots (histogram definition errors in prior plots, now fixed)
- plots make more sense, but more clean-up cuts would likely help -- work continues
- working on cluster optimization (algorithm modifications in analyzer)
- Provokar will be out of town in the near future (will be posted on the wiki)
- Has been working on a number of 'how-to' scripts for experts (Arun, Sebastian, etc)
- New HV settings made for upcoming BB/SBS on/off settings
- Timing hodoscope:
- working on RF alignment
- HV instructions for hodoscope are in the wiki (and also re-posted to halog)
- Grinch:
- Study of LED data taken under different BB+SBS conditions underway
- Maria/Todd/Bradley will be taking some more opportunistic LED pulser data through the weekend
- GEMS:
- GEM HV scan using cosmics will be worked on over the weekend
- Likely still a good idea to do a (quick) 'voltage scan' with beam as well. Details TBD
- This will be a GEM-expert driven program.
- Work continues on calibrating/understanding the new GEM layer
- Beamline:
- indications that the 'clock' rate used to compute rates from scaler data in each scaler crate (SBS, LHRS) need to be checked
- clock value in analyzer likely off by a little in at least one arm
- David F will go down into the Hall and explicitly measure the rates
- Resolved: Clock signal rates measured here: https://logbooks.jlab.org/entry/3946822
- indications that the 'clock' rate used to compute rates from scaler data in each scaler crate (SBS, LHRS) need to be checked
- David F is looking at scaler sanity checks with Paul
- DAQ:
- Alex reports that the LHRS scalers are not gated by the Trigger Supervisor -- will look into it
- Bob M. and David F. have responded and will be taking care of this
- Alex reports that the LHRS scalers are not gated by the Trigger Supervisor -- will look into it
- Replay analysis:
- GEM work is ongoing
- Eric working on end-of-run report file output along with Dave F.