RC meeting and Run Plan, Saturday November 5th
From SBS wiki
Return to the RC Meeting Calendar
Contents
RC Meeting Information
No Meeting today
Useful Links
Current Status
Hall Status
- Hall in restricted access for continued configuration change operations
- SBS repositioned
- Helmholtz coils rotated
- Beamline reinstalled
Open Issues
- A final RF module needs replaced in BPM VME crate. IPM1H04A still does not send the signals we need for verification of beam position in the hall. Simona is working with Tony Delacruz on this issue and it will be addressed on Monday.
- Oven heater variac controllers were replaced and tested by Ellen and Todd.
- Jack identified several issues with gas canisters in the hall:
Polarized Target
- Current Polarization: N/A (Target not installed at present)
- Hourly screenshots suspended until target installation. Lasers locked out.
Future Plans
- Hall in restricted access for remainder of configuration change
- We will be moving to CANS (restricted access with laser training) on Sunday swing. Check with RC if you need access during that time.
- Please check with RC for access beyond DAQ bunker during the day
Shifts and Meetings
- Shift leader and target operator are on stand-by today for all shifts.
Other Topics
Experimental progress (for MCC planning meeting)
- 6.1% of accumulated charge for PRODUCTION data (13.55 Coulombs out of 232)
- 29% Experimental run time (41 out of 141 days)
- Long term "to do" items; not urgent, some can be done when 3He target not available
- Luminosity scans with GEMs
- Opportunistic BCM calibration (higher current) before pass change?
- INFN LV Scan and DAQ Stability - maybe 20-30 minutes if nothing else can run
- Misc. GEM commissioning items: https://sbs.jlab.org/wiki/index.php/CommissioningPlan#BB.2FSBS_GEM_Commissioning_.28Continuation.29
Run Plan After Configuration Change
Continue to update 'standard' run plan for 3-pass data taking as necessary.
Current Plan:
- NMR measurement
- Restore beam
- Optics and H2 Ref Cell (Sometime during run)
- Production Run Plan
- 1.) He-3 runs, at 45uA of beam current. Use ps3==0, ps5=12, all others -1. Take four runs that should each last for one hour.
- 2.) Move the target to the pickup coil position, and the TO should run an NMR sweep to measure the polarization.
- 3.) Return to step 1.)
While on shift:
- Keep an eye out for drifting BPM positions
- Log all DAQ crashes in the excel worksheet along with the reason for the crash
- If beam has been down due to accelerator issues perform a checkout of the beam profile by doing harp scans and check beam centering on target using the Carbon hole target, see Simona's procedure: procedure, If in doubt about whether you should go through the beam checkout procedure, call this number: 7578693131.
- Cross check the rate with what is expected: log
- Cross check with the expected ion chamber readings: log
Notices in Effect for Shift Crew
All shifts (TO and SL) are on standby today
Be sure to follow these procedures:
- Power down SBS, BB, and Detector HV before controlled access and allowing RadCon in the hall
- Communicate to the TO that the SBS and BB magnets will be powered down, so they can update the holding field
- See the beam recovery procedures at: HOW_TOs#Beam_Recovery_Procedure
- See the instructions to set the raster at: HOW_TOs#How_to_ask_MCC_to_set_the_desired_raster_size_of_6_mm
Shifts and Long Term Issues
- Shift Openings: We're looking good for now! Schedule
Planned Accesses to the Hall
In Restricted Access. Configuration change ongoing.
Special Requests
Any special requests?