RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934
Accelerator Status
- Pass change scheduled for Monday
- VIP Tour tomorrow
- Machine very reliable since last SWING
- ARC7 issues are making currents able 3.5 uA very challenging
Hall A Status and News
- Almost done SBS-4 Run Plan !!
- MCC aware we will insert sieve slit on SWING
- Hall going to restricted tomorrow for reconfiguration
- Neat plots by Mark here
Current Run Plan
Subsystem Updates
- HCAL
- BBCal
- Timing Hodoscope
- Grinch
- GEMS
- DAQ
- Replay Analysis
Reminders to shift crew
- Check GEM gas mix every 2 hours
- HALOG GEM efficiency plots e.g. (https://logbooks.jlab.org/entry/3930258)
- Fill Out Run list
- New Quick Beam checkout procedure (Target at home, Harps SCAN, check BPM strip chart) No C Hole after initial checkout completed at each configuration
- Ramp BB magnet to 0 before "power off". Here is a nice entry by Jack here
Current Issues
- Can't identify pulsar events in HCal (Ole, Alex)
- Need script/method to determine # good events
- Need script to get accumulated charge
- Target Vent Pressure Alarm is silenced. Experts are aware entry