  • 4th pass separator has prevented beam to Hall A since Wed afternoon. Repairs are underway and will continue today. Expectation is to begin beam restoration around noon on Friday
    • SL shifts cancelled for Thurs Swing, Friday OWL. TOs must report as planned.
  • GEM layer was successfully replaced yesterday (Wed)
    • 2 bad APV cards identified yesterday and fixed today
    • CODA pedestal configuration and Analyzer DB updates in progress
  • Hall has been in Controlled Access since Wed evening with some periods in Power Permit
  • A set of cosmics runs were completed with 4 combinations of SBS and BB on/off (while under 'Power Permit')
    • Grinch runs taken with LED pulser enabled
      • NOTE: Some interaction between LED pulser and DAQ complicated this -- kudos to Maria for keeping and eye on this last night!
    • Thresholds and latencies for HCAL and BBCAL updated for good cosmics triggers

Additional details in sub-section notes below.

We are still planning to move to SBS-11 starting Monday, November 22. That will be a ~2 day configuration change in the Hall (Mon/Tue) followed by a Pass change (Hall A 4-->5) on Wed Nov 24.

Pending Issues

  • Need to ensure the following before restarting production:
    • HCAL latencies restored [Done]
    • BBCAL and HCal Thresholds restored
    • Confirm new UV layer HVs are in the alarm handler and are being logged/monitored correctly
    • GEM pedestals evaluated and loaded/tested for online pedestal suppression
    • GEM tracking software / analyzer updated and ready?
    • Restore Grinch LED pulser to 10 Hz [Done]
  • Upcoming shift schedule issues https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=GMn-2021
    • Will try to arrange for a Hall walkthrough Friday morning for Weibin (and perhaps Konrad)?
    • Several open TO positions starting Nov 24
    • emailed Albert to confirm he is OK for Sat/Sun OWL shifts (schedule indicates trade requested)
      • Bogdan has agreed to pick up those shifts [Done, shift schedule updated]

Subsystem Updates

  • Hall Status:
    • Presently in Controlled Access, may move to Power Permit overnight if further tests with fields on are requested.
    • Techs have some work in the Hall Friday morning (doesn't affect BB or SBS)
    • Hall A Walkthrough training planned for 10am for 3 people
  • HCAL:
    • HV issues from yesterday have been resolved; HV in good shape
    • BBCAL and HCAL thresholds back to production settings
    • HCAL latencies set back to standard settings
    • HCAL timing investigated (LOG)
      • similar plot requested from FADC timing to compare with 'real' TDC time
      • more to come
  • BBCal:
    • First look at runs with different combinations of BB and SBS magnets on
    • general gain matching is looking uniform across the detector
    • will follow up with details on observed impact of fringe field
  • Timing hodoscope:
    • Request to continue cosmics
    • working on RF alignment
  • Grinch:
    • Pulser resetting has been returned to 10 Hz
    • Study of LED data taken under different BB+SBS conditions underway
  • GEMS:
    • J2 layer swapped with UVa U-V layer; 2 faulty APVs addressed
    • Online DB (zero suppression) completed
    • Analyzer DB updates are in progress; DB updated with new geometry, etc completed; Some preliminary track analysis from Cosmics data were done. Basic functionality checks out, but Andrew is working through the punch list.
    • When beam returns
      • Plan for an HV scan on the new layer when beam returns
      • Take short run at low current to check 'best case' tracking
  • Beamline:
    • David F is looking at scaler sanity checks with Paul
  • DAQ:
    • Alex was going to look at the instability associated with the GRINCH LED
  • Replay analysis:
    • Andrew is focussed on the GEM related updates after the layer swap
    • Needs new pedestals for the replaced APVs