RC meeting and Run Plan, Thursday December 16th
From SBS wiki
RC Meeting Information
Run Coordinator: Bogdan Wojtsekhowski
Location: BJ and Counting House Conference Room
Time: 3:15PM
Remote connection link: https://bluejeans.com/256205934
Toll-Free Number (U.S.& Canada): 1-888-240-2560
Bluejeans Meeting ID: 256 205 934
Upcoming Shifts Which Need Filled
Urgent issue: about 200 shifts on GMn run after the winter break shutdown need to be filled.
Today's estimate for January start: Tune beam Tue. Jan 11, "Bonus beam" Jan 12-16.
Official physics start on Jan 17.
Accelerator and Hall Status
- steady production for GMn SBS-11 kinematics
- End of beam: Tue. Dec. 21 at 7:00 AM
To be Done During Extended Down Time
- Cosmic runs ?
Run Plan
- Continue "cycles"
- Currently LD2 for "Cycle 20"
- Continue following cycle pattern and ticking off runs-completed on paper copy at SL desk
Opportunistic Access Needed for
Resolved Issues
Unresolved Issues
- Shift takers for the January-February run.
- DAQ procedures for reboot
- Occasional timing shifts of ~70 ns !
- Replay of the all data
- List of DAQ experts "on call"
- why the BBcal rate is up from 2.5kHz to 3 kHz at the same HV and threshold?
- why DAQ dead time is lower than was a few days before?
- DAQ typical problem is related to MPD
- Issue of loosing sectors in the UV GEMs.
Subsystem Updates
- HCal
- F1 errors (HCal sync errors)... Don't ignore!! End, Reset(twice?), Configure, Download. If that doesn't work, call per list on white board. One happened last night.
- Correlation plot of HCal ADC time and HCal TDC gives clear sign of 70 ns shift in either ADC or TDC - pay attention.
- BBCal
- Scan the trigger rate vs. beam current?
- Timing Hodoscope
- Expecting report today.
- GRINCH
- Expecting report today.
- GEMS
- Time line of UV#4 is needed.
- Beamline
- What are the accuracy for the beam charge and energy?
- Replay analysis
- How to organize massive replay process?