Return to the RC Meeting Calendar

RC Meeting Information

Time: Daily at 3:30pm

  • Location: Counting house conference room

Shift Schedule

https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=SBS-GEn-2022

Useful Links

Current Accelerator and Hall Status

  • We finished Hall Sweep and went to Beam permit yesterday around 5 PM.
  • We are running production on He3 target at the moment of this log entry
  • Only Hall A and D are running at the moment

Pol-He3 Target

Beam Status

Current Run Plan

  • Resume production run on He3 target, 20 uA
  • Gordon mentioned an EPR measurement during the day shift, seems already done ? [ https://logbooks.jlab.org/entry/4093630 ]
  • Have experts check on 50K replay

Current Issues

Planned Accesses to the Hall

  • Possibly Hodoscope would need an access during this swing shift

Special Requests

  • None

Notices in Effect for Shift Crew

  • Power down SBS, BB, and Detector HV before making an access to the Hall