RC Report

Summary

  • Ran with ~30 uA beam overnight increasing to 40 uA
  • No beam since 7am, up to now tune was not productive, Yves is at MCC

Issues

  • DAQ lost time reach 1+ hour during owl shift

Current Status

  • Beam tune

Run Plan

  • Continue running 45 uA on He3
  • Accelerator will prioritize beam and not have any maintenance days this week

Data Collection and Polarization Status

  • 33.2C of uncorrected charge for this kinematic (38.8C of corrected charge)
  • Last NMR 53.9%%

Other Topics/Status Updates

  • Anything else?
  • Bill wants to change the raster settings after some analysis

Requested Accesses to the Hall

  • Jack would like to collect some cables