RC meeting and Run Plan, Thursday October 28th
From SBS wiki
RC Meeting Information
RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934
Accelerator Status
- Reconfiguration/energy change scheduled on Nov 5th-Nov 8th: plan is to stop operation on Nov 5th, and resume on Nov 8th with new energy (980MeV/pass);
Hall A Status and News
- Run Certificate still on pause; waiting for Friday's review
Subsystem Updates
- HCAL: update of db with TDC offset + update of panguin plots; problem of LED pulser fixed (it was a time window to adjust)
- BBCal: Same status
- Timing Hodoscope: nothing major, keep progress on analysis;
- Grinch: test: edtm sent in vetroc, checked in scalers, etc.
- GEMS: Working in EEL on GEMs for GEnRP; Jack trying to figure out the gas issue;
- DAQ: https://logbooks.jlab.org/entry/3933755
- Replay Analysis: Beam LHRS scalers are now in the output tree; GEMs: new alignment parameters+gamin matches; Plan for mass production for SBS1-SBS4