RC meeting and Run Plan, Wednesday December 8th
From SBS wiki
NEXT RC IS BRIAN :)
RC Meeting Information
Run Coordinator: Eric King
Location: Counting House Conference Room
Time: 3:15PM
Remote connection link: https://bluejeans.com/256205934
Toll-Free Number (U.S.& Canada): 1-888-240-2560
Bluejeans CODE: 256 205 934
Upcoming Shifts Which Need To Be Filled
A couple more shifts were signed up for. A total of 12 shifts remain until the winter break shutdown half of which are this upcoming weekend.
- Sat Dec 11th, OWL, SL
- Sat Dec 11th, DAY, SL
- Sat Dec 11th, DAY, TO
- Sat Dec 11th, SWING, TO
- Sun Dec 12th, OWL, SL
- Sun Dec 12th, DAY, TO
- Sun Dec 12th, SWING, TO
- Wed Dec 15th, OWL, SL
- Fri Dec 17th, OWL, TO
- Sat Dec 18th, OWL, TO
- Sat Dec 18th, DAY, TO
- Sun Dec 19th, DAY, TO
Accelerator and Hall Status
- (Hall) Access during Tuesday SWING [1] to look at GEMS (timing depended solely on GEM work).
- (Hall) Access for Andrew (fr. Jessie's crew) to install the aluminum absorber (perhaps have results to review in meeting).
To Be Done During Extended Down Time
- (GEM) Would like to take special lower-HV test runs while beam is off.
- (BBCal) May potentially need more cosmics data.
- (HCal) Would like to take special data runs.
Run Plan
Continue taking production data. :) We should be entering cycle 10 soon.
- (Not updated yet) Bogdan will update/extend run plans available on the SBS Wiki.
Data Collected (RC Week)
Data collected by shift.
Week 12/1 thru 12/8 | ||||
---|---|---|---|---|
Triggered Events (Millions) | ||||
Day | Shift | LH2 | LD2 | Dummy |
Dec 1 | SWING | 10.0 | - | - |
Dec 2 | OWL | 1.0 | 20.2 | - |
DAY | - | 60.6 | - | |
SWING | 20.5 | 5.6 | 2.7 | |
Dec 3 | OWL | - | 43.4 | - |
DAY | 20.4 | 27.0 | - | |
SWING | - | 38.2 | - | |
Dec 4 | OWL | - | 48.2 | - |
DAY | 7.9 | 40.9 | - | |
SWING | - | 44.0 | 3.5 | |
Dec 5 | OWL | 13.0 | 40.8 | - |
DAY | - | 47.3 | - | |
SWING | 12.9 | 30.1 | - | |
Dec 6 | OWL | - | 50.2 | - |
DAY | 12.1 | 30.3 | - | |
SWING | - | 30.1 | - | |
Dec 7 | OWL | 6.0 | 20.0 | 3.5 |
DAY | - | 30.0 | - | |
SWING | - | 18.4 | - | |
Dec 8 | OWL | 6.0 | 42.0 | - |
DAY | - | 61.4 | - | |
Total Triggered Events: | 103.8 | 728.9 | 9.7 |
By Cycle:
Week 12/1 thru 12/8 | |||
---|---|---|---|
Triggered Events (Millions) | |||
CYCLE | LH2 | LD2 | Dummy |
1 | 11.0 | 80.8 | 2.7 |
2 | 20.5 | 76.0 | - |
3 | 20.4 | 86.4 | - |
4 | 7.9 | 84.9 | 3.5 |
5 | 13.0 | 88.1 | - |
6 | 12.9 | 80.3 | - |
7 | 12.1 | 80.4 | 3.5 |
8 | 6.0 | 80.4 | |
9 | 6.0 | 71.4 | |
Totals | 103.8 | 728.9 | 9.7 |
Opportunistic Access Requests (Running List)
- [Ralph] Timing hodoscope (remove card which will stay in hall).
- [Maria/Todd] GRINCH (Could use any reasonable amount of time [LED runs]).
- Removal of INFN J2 from Hall [Jessie has been contacted about this; will be completed over winter break barring an opportunistic access before then].
- [Sebastian] Swap out SD card in RaspPi in HCal upper crate. Needs 1+ hour of controlled access.
Unresolved Issues
- [Resolution underway] Hodoscope HV alarms going off [4]; I created a HALOG entry and tagged Ralph/Rachael [5]. Apparent repeat of issue on 11/25 [6]. Ralph came in to double check the issue and make sure it wasn’t a hodoscope hardware problem. Ralph will be coordinating with Stephen Wood on a resolution.
Subsystem Updates
- HCal
- Better Panguin plots made.
- Golden runs added to plots.
- BBCal
- Nothing of note.
- Timing Hodoscope
- Nothing new.
- GRINCH
- HV settings may be too low (can be handled by Alex).
- GEMS
- Andrew fixed the low efficiency problem--software related.
- J0: Turned on HV this morning... still strange behavior on mid and bottom modules.
- Andrew has had a change of opinion on potentially altering the HV by -50V.
- Beamline
- No new updates.
- Replay analysis
- Nothing of note.