RC meeting and Run Plan, Wednesday Nov. 15, 2023

From SBS wiki
Jump to: navigation, search

Return to the RC Meeting Calendar

RC Meeting Information

Time: Monday - Friday at 3:30pm

  • Location: Counting house conference room
  • ZoomGov Meeting Connection Information

https://sbs.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=431

Useful Links

Procedures

Hall A call-in instructions:

  • Call RC first.
  • Techs on site 7am-4:30pm Mon-Thu, 7-11am Fri. RC will call Hall A work coordinator (Zak) during normal working hours. After hours, RC calls Tech on-call.
  • After 9pm everything non-emergency needs to be deferred. What is emergency and what's not? Call RC. RC talks with Mark to decide.

Hall Access procedure:

  • Access check list (binder on the counting room desk) needs to be filled out before making *any* access.
  • Scan (take pictures with phone) and post it to the logbook.
  • Any work inside the SBS, BB boundary need to have PS locked out -- requires two QEWs to throw the big switch. Exception: field measurements.

Status Update

Overall Summary

General

Shift Plan

  • All shifts are canceled through Friday Owl shift.

Beam

  • None!

Hall A Dump Repair

  • Decon gel has been applied to building 91, and when it is dry facilities will check electronics.
  • We aim for beam on Friday.

Accelerator status

  • No beam to any of the halls until the end of swing shift today.

Data collected :

None!

Hall A Subsystems Status

Target

Detectors

Magnets

  • SBS and BB are ready to turn on.

Hall access requests

We are in restricted access.

Shift schedule

IMMINENT OPEN SHIFTS

  • The shift schedule is very empty for the next 2 weeks. Please sign up if you can!!

Please check when your shifts are!

https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=SBS-GEn-2022

Please sign up for any open shifts!

Running Plan

  • Restore beam as soon as we can!

==> List of items in case He3 production running isn’t ready: