RC meeting and Run Plan, Wednesday November 3rd
From SBS wiki
RC Meeting Information
RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934
Accelerator Status
https://logbooks.jlab.org/entry/3936389
Hall A Status and News
Subsystem Updates
- HCAL: N/A
- BBCal: still need to order parts for dry air flow to PMT; scatter magnetic field sensors around BBPS to evaluate fringe fields: shall they be removed before taking beam? answer: we don't know about radiation hardness of these, but hey are pretty cheap; they shall be fixed in such a way they won't move around;
- Timing Hodoscope: calibrations: time walks, light propagation speeds, etc msotly ready, shall be submitted for pull request tomorrow;
- Grinch: need to change FADC mode from 1 to 7; need to take LED data to test;
- GEMS: took cosmics last night to check the latency, need to go downstairs to check the LV plug.
- Beamline: scalers from SBSVME29 look sensible, unlike LHRS scalers. Most likely it is a software issue, which is investigated by David and Bob.
- DAQ: N/A
- Replay Analysis: N/A