RC meeting and Run Plan, Friday October 29th

From SBS wiki
Revision as of 16:32, 29 October 2021 by Efuchey (Talk | contribs) (Hall A Status and News)

Jump to: navigation, search

Meetings Page

RC Meeting Information

RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934

Accelerator Status

  1. Reconfiguration/energy change scheduled on Nov 5th-Nov 8th; maintenance day moved from Tuesday, Nov. 2nd to Wednesday, Nov. 3rd;

Hall A Status and News

  1. Review results/feedback:

A review was conducted to reassess Hall A readiness and determine:

  • if the incidents were understood => answer is yes;
  • what were the mitigations installed or planned to avoid such incidents to occur again => answer is yes;
  • what will be the updated processes and procedures => need several new OSPs

Review committee issued a list of recommandations and a worklist to complete before resuming operations. Implementing such constraints would bring us to the middle of next week /in the most optimistic scenario/; Provided the proximity of the accelerator reconfiguration, decision was taken to prepare directly for SBS7 kinematic setting and resume on Monday Nov 8th.

Subsystem Updates

skipped for today

  1. HCAL:
  2. BBCal:
  3. Timing Hodoscope:
  4. Grinch:
  5. GEMS:
  6. DAQ:
  7. Replay Analysis: