RC meeting and Run Plan, Friday October 29th
From SBS wiki
RC Meeting Information
RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934
Accelerator Status
- Reconfiguration/energy change scheduled on Nov 5th-Nov 8th; maintenance day moved from Tuesday, Nov. 2nd to Wednesday, Nov. 3rd;
Hall A Status and News
- Review results/feedback:
A review was conducted to reassess Hall A readiness and determine:
- if the incidents were understood => answer is yes;
- what were the mitigations installed or planned to avoid such incidents to occur again => answer is yes;
- what will be the updated processes and procedures => need several new OSPs
Review committee issued a list of recommandations and a worklist to complete before resuming operations. Implementing such constraints would bring us to the middle of next week /in the most optimistic scenario/; Provided the proximity of the accelerator reconfiguration, decision was taken to prepare directly for SBS7 kinematic setting and resume on Monday Nov 8th.
Subsystem Updates
skipped for today
- HCAL:
- BBCal:
- Timing Hodoscope:
- Grinch:
- GEMS:
- DAQ:
- Replay Analysis: