RC meeting and Run Plan, Thursday November 25th

From SBS wiki
Revision as of 21:55, 29 November 2021 by Xbai (Talk | contribs) (Run Plan)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Daily_Meetings

RC Meeting Information

RC Daily Meetings are at 3:15pm, remote connection link: https://bluejeans.com/256205934

Accelerator, Hall Status and runplan Progress

Pending and New issues

  • GEM layer J0 common mode is drifting higher again, last time it was due to a loose LV connector. We will live with this for now since all GEM data seems fine, we will resolve this issue next time when we get a chance to access the Hall
  • HODO scope HV issue (still there? need expert to confirm), see log: https://logbooks.jlab.org/entry/3950179 and https://logbooks.jlab.org/entry/3950158
  • analysis of GEM optics run from Andrew suggests that:The track distributions (page 4) are more or less as we might expect to see for the sieve slit, except it appears there may be some "hot spots" in the BBCAL trigger, suggesting perhaps the gain needs adjusting on some channels? BBCAL experts should look into this. In particular, there is a spike in the track distribution at about +0.5 m in x, which might map to the bottom row or rows of BBCAL.

Resolved Issues

  • GEM Latency seems fixed
  • DAQ is stable

Subsystem Updates

  1. HCAL:
  2. BBCal:
  3. Timing hodoscope:
  4. Grinch:
  5. GEMS:
  6. Beamline:
  7. DAQ:
  8. Replay analysis:

Run Plan

We will go to production for SBS-11 around noon, following the run plan here: https://sbs.jlab.org/wiki/index.php/Main_Page