RC meeting and Run Plan, Friday November 4th
From SBS wiki
Revision as of 12:21, 4 November 2022 by Sseeds (Talk | contribs) (Created page with "Return to the RC Meeting Calendar = RC Meeting Information = <b>Time:at 3:30pm today</b> *Location: Counting house conference room *Join Zoo...")
Return to the RC Meeting Calendar
Contents
RC Meeting Information
Time:at 3:30pm today
- Location: Counting house conference room
- Join ZoomGov Meeting
- https://jlab-org.zoomgov.com/j/1619032184?pwd=aWhTVWxya1ZZQzA1K2ZPSTd2ZX...
- Meeting ID: 161 903 2184
- Passcode: 260715
- Dial by your location
- +1 669 254 5252 US (San Jose)
- +1 646 828 7666 US (New York)
- +1 551 285 1373 US
- +1 669 216 1590 US (San Jose)
- 833 568 8864 US Toll-free
- Find your local number: https://jlab-org.zoomgov.com/u/acj3pTicMx
Useful Links
Current Status
Weekend Shifts
- Shift leader and target operator shifts are on standby for the weekend. At this stage, we will require SL and TO to return Monday Owl, but SL will likely be put on stand by through Monday.
Hall Status
- Hall in restricted access for continued configuration change operations
- Beamline removed
- Magnet move underway
- Possible updates from Jessie
- Last update: A final RF module needs replaced in replaced BPM VME crate. The work will need to be validated by Simona.
- Possible status update from Simona
Open Issues
- Compass field measurements were not successful. Gradient measurements will be used in stead. Possible updates from Bogdan.
- Oven heater variac controllers need replaced and tested. Possible updates from Todd.
- UVA optics assembly removed from optics enclosure and tested at EEL. Possible updates from Gordon.
Polarized Target
- Current Polarization: N/A (Target not installed at present)
- Hourly screenshots suspended until target installation. Lasers locked out.
- UVA optics assembly removed from optics chamber and moved to EEL with Adam's help for tests. Possible updates from Gordon.
Subsystems
- Any Updates?
Future Plans
- Hall in restricted access for remainder of configuration change
- Hall access is open to subsystem experts after 1700 and before 0800
- Please check with RC for access beyond DAQ bunker during the day
Other Topics
Experimental progress (for MCC planning meeting)
- 6.1% of accumulated charge for PRODUCTION data (13.55 Coulombs out of 232)
- 28% Experimental run time (40 out of 141 days)
- Long term "to do" items; not urgent, some can be done when 3He target not available
- (Luminosity scans with GEMs)
- (Opportunistic BCM calibration (higher current) before pass change?)
- (INFN LV Scan and DAQ Stability - maybe 20-30 minutes if nothing else can run)
- Work and testing on LV supplies during opportunistic access. Possible update from Holly
- (Misc. GEM commissioning items:)https://sbs.jlab.org/wiki/index.php/CommissioningPlan#BB.2FSBS_GEM_Commissioning_.28Continuation.29)
Run Plan After Configuration Change
Need updated 'standard' run plan for 3-pass data taking
NMR measurement Restore beam
Run Plan 1.) He-3 runs, at 45uA of beam current. Use ps3==0, ps5=12, all others -1. Take four runs that should each last for one hour. 2.) Move the target to the pickup coil position, and the TO should run an NMR sweep to measure the polarization. 3.) Return to step 1.)
- Keep an eye out for drifting BPM positions
- Log all DAQ crashes in the excel worksheet along with the reason for the crash
- If beam has been down due to accelerator issues perform a checkout of the beam profile by doing harp scans and check beam centering on target using the Carbon hole target, see Simona's procedure: [1], If in doubt about whether you should go through the beam checkout procedure, call this number: 7578693131.
- Cross check the rate with what is expected: [2]
- Cross check with the expected ion chamber readings: [3]
Notices in Effect for Shift Crew
- Power down SBS, BB, and Detector HV before controlled access and allowing RadCon in the hall
- Communicate to the TO that the SBS and BB magnets will be powered down, so they can update the holding field
- See the beam recovery procedures at: HOW_TOs#Beam_Recovery_Procedure
- See the instructions to set the raster at: HOW_TOs#How_to_ask_MCC_to_set_the_desired_raster_size_of_6_mm
Current Issues
- Given the delay and unfeasibility of completing the configuration change tomorrow, when can we expect to complete the configuration change?
- Shift Openings: Wednesday OWL, Thursday OWL. [4]
Planned Accesses to the Hall
- In Restricted Access. Configuration change ongoing.