RC meeting and Run Plan, Monday November 21st

From SBS wiki
Revision as of 10:18, 21 November 2022 by Jpoudel (Talk | contribs) (RC Updates)

Jump to: navigation, search

Return to the RC Meeting Calendar

RC Meeting Information

Time:at 3:30pm today

  • Location: Counting house conference room

RC Updates

Summary of swing 11/20 - day 11/21

  • Productive swing and owl shifts to collect good fraction of data on polarized He3 target @45uA beam current with prescale: ps1=9, ps2=15, ps3=0, ps5=3 and all other -1
  • No major issue on DAQ during this time
  • South Linac went to controlled access after MCC meeting to repair turbo pumps (no estimation provided)

Short term run plan

  • Continue production data taking on polarized He3
  1. 45uA of beam current | Use ps3=0, ps5=3, ps2=15, rest =-1 | One hour long runs
  2. Move the target to the pickup coil position, and do NMR sweep around every 3 hours
  3. Return to step 1
  • Consideration to increase beam current to 50uA during tomorrow day shift

Issues

  • Dump right Ion chamber cabling needs to be changed (Jerry Kowal is aware of it)

Hall Access List

  • Alexandre Camsonne (SBS GEM Crate)