RC meeting and Run Plan, Thursday December 1st
From SBS wiki
Revision as of 11:41, 1 December 2022 by Xbai (Talk | contribs) (Created page with "Return to the RC Meeting Calendar = RC Meeting Information = <b>Time: Daily at 3:30pm</b> *Location: Counting house conference room *Join Zo...")
Return to the RC Meeting Calendar
Contents
RC Meeting Information
Time: Daily at 3:30pm
- Location: Counting house conference room
- Join ZoomGov Meeting
- https://jlab-org.zoomgov.com/j/1619032184?pwd=aWhTVWxya1ZZQzA1K2ZPSTd2ZX...
- Meeting ID: 161 903 2184
- Passcode: 260715
- Dial by your location
- +1 669 254 5252 US (San Jose)
- +1 646 828 7666 US (New York)
- +1 551 285 1373 US
- +1 669 216 1590 US (San Jose)
- 833 568 8864 US Toll-free
- Find your local number: https://jlab-org.zoomgov.com/u/acj3pTicMx
Useful Links
Current Accelerator andHall Status
- We are running production on He3 target at the moment of this log entry
- Only Hall A and D are running at the moment
PolHe3 Target
- Target Cells installation was completed yesterday around 2 PM.
- We finished Hall Sweep and went to Beam permit yesterday around 5 PM.
- After Hall closed up, Gordon and Hunter performed an initial target test with target cell Hunter. One NMR measurement for Polarization from the OWL shift is around 36.7% (rough). Please see a nice log by Gordon summarizing the target test: [2] and also the screenshot for polarization: [3]
Beam Status
- In short, beam restoration completed - Thanks to Bill, Jiwan, and Mark!
- Raster size reduced to 5 mm [ https://logbooks.jlab.org/entry/4093316 ]
- Final beam position X=1.55 & Y = 1.05; Beam width at target : X=343059, Y=345833. Please see log entries by Bill and Jiwan for the final beam position https://logbooks.jlab.org/entry/4093506, and also see the carbon hole plot at [4]
- Hall A positions scan track from the beam position study [ https://logbooks.jlab.org/entry/4093442 ]
- Ion chamber calibration in He3 cell completed.
- At present, beam current was suggested to be max at 20 uA
Current Run Plan
For Friday SWING to MONDAY OWL we will be focusing on polarized helium-3 production.
- Question for target group: How long would you like to continue taking NMR measurements every ~2 hours?
Run Plan 1) Resume production run on He3 target 2) Gordon mentioned an EPR measurement during the day shift 3) Have experts check on 50K replay
Current Issues
- BB Hodoscope: channel 0R - 15R missing in the 50K replay
- Pre-scale factors, only coin and Grinch pulser trigger are enabled at the time of this log
Planned Accesses to the Hall
Special Requests
- BB Hodoscope, escorted access?
Notices in Effect for Shift Crew
- Power down SBS, BB, and Detector HV before making an access to the Hall