RC meeting and Run Plan, Thursday December 1st

From SBS wiki
Revision as of 11:45, 1 December 2022 by Xbai (Talk | contribs) (Pol-He3 Target)

Jump to: navigation, search

Return to the RC Meeting Calendar

RC Meeting Information

Time: Daily at 3:30pm

  • Location: Counting house conference room

Useful Links

Current Accelerator and Hall Status

  • We finished Hall Sweep and went to Beam permit yesterday around 5 PM.
  • We are running production on He3 target at the moment of this log entry
  • Only Hall A and D are running at the moment

Pol-He3 Target

  • In short summary, Polarization for Cell Hunter finished, ready for production run
  • Target Cells installation was completed yesterday around 2 PM. [ https://logbooks.jlab.org/entry/4093240 ]
  • After Hall closed up, Gordon and Hunter performed an initial target test with target cell Hunter. One NMR measurement for Polarization from the OWL shift is around 36.7% (rough). Please see a nice log by Gordon summarizing the target test: [ https://logbooks.jlab.org/entry/4093498 ] and also the screenshot for polarization: [1]

Beam Status

Current Run Plan

  • Resume production run on He3 target
  • Gordon mentioned an EPR measurement during the day shift
  • Have experts check on 50K replay

Current Issues

  • BB Hodoscope: channel 0R - 15R missing in the 50K replay
  • Pre-scale factors, only coin and Grinch pulser trigger are enabled at the time of this log


Planned Accesses to the Hall

Special Requests

  • BB Hodoscope, escorted access?

Notices in Effect for Shift Crew

  • Power down SBS, BB, and Detector HV before making an access to the Hall