RC meeting and Run Plan, Thursday December 1st

From SBS wiki
Revision as of 15:44, 1 December 2022 by Xbai (Talk | contribs) (Current Run Plan)

Jump to: navigation, search

Return to the RC Meeting Calendar

RC Meeting Information

Time: Daily at 3:30pm

  • Location: Counting house conference room

Shift Schedule

https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=SBS-GEn-2022

Useful Links

Current Accelerator and Hall Status

  • We finished Hall Sweep and went to Beam permit yesterday around 5 PM.
  • We are running production on He3 target at the moment of this log entry
  • Only Hall A and D are running at the moment

Pol-He3 Target

Beam Status

Current Run Plan

Current Issues

Planned Accesses to the Hall

  • Possibly Hodoscope would need an access during this swing shift

Special Requests

  • None

Notices in Effect for Shift Crew

  • Power down SBS, BB, and Detector HV before making an access to the Hall