RC Meeting Information
- Current RC: Eric King
Time: Daily at 3:30pm
- Location: Counting house conference room
- Join ZoomGov Meeting
- https://jlab-org.zoomgov.com/j/1619032184?pwd=aWhTVWxya1ZZQzA1K2ZPSTd2ZX...
- Meeting ID: 161 903 2184
- Passcode: 260715
- Dial by your location
- +1 669 254 5252 US (San Jose)
- +1 646 828 7666 US (New York)
- +1 551 285 1373 US
- +1 669 216 1590 US (San Jose)
- 833 568 8864 US Toll-free
- Find your local number: https://jlab-org.zoomgov.com/u/acj3pTicMx
Shift Schedule
- https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=SBS-GEn-2022
- Next empty shift is a Target Operator shift on Sunday 12/11.
- Besides that there are six (6) remaining shifts to be filled until winter shutdown; I'm sure Andrew would like them filled asap so he doesn't have to chase down any shift workers.
Accelerator Status
- Everything appears to be running smoothly at the moment.
- Hall C is down for about a week due to a vacuum break.
Current Status
- The experiment was back up and running yesterday evening by 8PM. :)
- Poor GEM track efficiency, alignment needed for analysis. Last spoke with Zeke at around 1:30AM'ish and he will continue working on alignment this morning after collaborating with other GEM experts. [4098462] [4098439] [4098413] [4090862]
- Accelerator has agreed to support a Møller measurement during Friday DAY.
- Accelerator last time didn't get started until about 9:30'ish. Target Operator still required. Shift leader should still come in as of now.
Issues Resolved
Issues remaining
- BB GEM APV unreachable and cannot be repaired at this time.
- Beam step size jump is still unresolved (I'm not clear if this has been resolved; I sent Jay an email asking for clarification for myself; Mark suggested that it would be nice if someone made, or has made, an ELOG record of this)
Short Term Run Plan
- Continue production run on He3 target, 36 uA
- Use GEnII-noSBSGEMs DAQ config
- Use ps3=0, ps5=6, others =-1
- BBCal threshold at -366 mV, HCal threshold at -19 mV
- NMR measurement every 3 - 4 hours, close to 4 hours is better
Planned Accesses to the Hall
- I presume that repairs for the BB GEM APV will wait until shutdown.
Special Requests
- None of which I'm aware, please email me ericking (@jlab.org or @temple.edu) if there's something to be added.
Notices in Effect for Shift Crew
- Power down SBS, BB, and Detector HV before making an access to the Hall
Data Collection Status
- 74 out of 141 days (~52.5%)
- Total uncorrected accumulated charge on He3: 47.020 C out of 232C (20.26%)
- 2-Pass: 13.467 C
- 3-Pass: 33.553 C (at end of OWL)