RC meeting and Run Plan, Wednesday April 23th

From SBS wiki
Revision as of 14:36, 23 April 2024 by Jcaylor (Talk | contribs) (Current Status)

Jump to: navigation, search

<< Back to Daily Meetings

RC Meeting Information

RC: Jimmy Caylor

Useful Links

Notices in Effect for Shift Crew

  • For controlled access call the RC and together you will fill out the Hall access checklist. [1]
  • Please pay attention to BTM, incorrect accounting is happening. also make sure to submit all hours, including the last one.
  • Please fill out the shift checklist and notify RC if there are any issues


Current Status

On the accelerator side:

  • Hall C in the middle of switch to 4 pass

--> Wien angle to -39.2

  • Beam studies on Thursday (delivery to Hall A dump)


On the Hall side:

  • Some HCal voltage set points got set to zero

--> Now has an alarm if at 0 V even if setpoint is zero

  • Detectors and DAQ seem to be working well (SBS GEMs in much better shape)
  • Production running at 17 uA overnight maximized trigger rates

--> Could be pushing the front track too hard

--> Might need to back down with the current

  • Production running until they make us stop

--> Wien change - how do we want to handle this?


GEN-RP KLL run plans

Current Issues

  • SBS GEM efficiency (optimize tracking efficiency vs current)

--> Update on work done during access

  • Active analyzer peak search on-going?

Special Requests

Sub-systems

  • SBS and BB magnets
  • BB GEMs
  • BB Grinch
  • BB Cal - Production threshold changed to 1.4 Gev
  • BB scin
  • SBS GEMs - See logbook
  • SBS analyzer + RP hodo - Channels 30 and 31 tripped during lumi scan for GEMs
  • SBS HCAL - https://logbooks.jlab.org/entry/4287249
  • DAQ
  • Analysis
  • Target
  • Beam line
  • Moller
  • Raster