RC meeting and Run Plan, Friday January 21th

From SBS wiki
Jump to: navigation, search

<<SBS Main<<Run Coordinators <<Daily Meetings

RC Meeting Information

Run Coordinator: Caryn Palatchi

Time: 3:15 pm

Remote connection link: https://jlab-org.zoomgov.com/s/1619032184

Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715

Upcoming Shifts Which Need Filled

URGENT: Shifts February need help - only 1 opening remaining

Accelerator and Hall Status

  • Controlled access - configuration change to SBS - 8 , sieve slit in

Run Plan

Update from Yesterday

  • SBS, HCal moved and survey
  • GRINCH HVs turned on and LED runs taken
  • Cosmics to be taken with BBCAl, GEMS HV on, HCal , turned off this morning.

Friday DAY Update

  • Finished Changing configuration to SBS - 8 (Beamline dir, BB, checklist including sieve in)
  • ted BBDAQ has a problem - to be surveyed later

Friday DAY - Sat DAY Plan

  • sieve is in (if manpower issues occur in OPS for OWL, we will remove sieve before midnight and bypass sieve-in steps, proceeding to sieve out plan)
  • Jack is checking out SBS spikes
  • close hall - beam permit

Friday SWING (SL: Ole Hanson, TO: Maria Satnik)

  • cosmics with SBS on (BB 750A, SBS70%) [responsible person - Provokar Datta 959-929-2373]
  • new HV setttings for new calorimeter [responsible person - Provokar Datta - 959-929-2373]
  • Beam checkout
  • GEM checkout[when beam first comes back after checkout, contact Sean Jeffas regarding GEM expert checkout - cell on whiteboard]
  • Sieve slit in optics data
    • Contingency plan
      • Check with MCC around 11pm if manpower issues have occurred in OPS for OWL tonight and whether they can or cannot support an escorted access
      • If we get all or most of our optics data before midnight, we remove the sieve.
      • If we get no or very little optics data before midnight, we run through owl shift with the sieve in, even if this leads to “too much” optics data, and remove it in the morning.
      • If we get about half the optics data before midnight, we remove the sieve, and decide whether to put it back in later after analysis of what we got
      • The zero-field, single-foil run and the field-on 5-foil run should be the top priorities. The 4-foil run and the LH2 run with sieve would be optional
    • 1 foils, magnet off [responsible person - Andrew P.]
    • 5 foils, magnet on [responsible person - Andrew P.]
    • 4 foils, magnet on [responsible person - Andrew P.]
    • LH2 sieve in run [responsible person - Andrew P.]

Friday OWL (SL: Thir Narayan Gautam - trade requested, TO: Jack Jackson)

  • Sieve slit out - wait 30min after beam is turned off before entering area for taking sieve out (radcon instructions) (if manpower issues occur in OPS for OWL we will remove sieve before midnight and bypass sieve in steps proceeding to sieve out plan)
    • ARM/escorted access of expert to remove slit (2-3 ppl including 1 expert needed to remove slit [responsible person - Sebastian]
    • GEM checkout 1,2,3,4,5uA on LH2 to 200k events/run [contact Sean Jeffas regarding GEM expert checkout - cell on whiteboard]
    • Sieve slit out BBcal run[responsible person - Andrew P.]
    • Production
    • follow SBS8 run plan This week's Run Plan
  • Future: OPS down
    • Accelerator needs to understand what performance that they can get from SL18 cavity to plan for the next run periods beam energy.They are proposing a 3-4 shift beam down
    • Jan 25th day and restoring beam end of day Jan 26th
    • B goes to 2 pass Monday DAY 1/24

Need to discuss Long term plan

Today's Run Plan

This week's Run Plan

SBS-8 Long term plan


Future: OPS down

    • Accelerator needs to understand what performance that they can get from SL18 cavity to plan for the next run periods beam energy.They are proposing a 3-4 shift beam down
    • Jan 25th day and restoring beam end of day Jan 26th
    • B goes to 2 pass Monday DAY 1/24

Need to discuss Long term plan

Today's Run Plan

This week's Run Plan

SBS-8 Long term plan

Resolved Issues

  • opportunistic access for VETROC/GRINCH
  • GRINCH HVs turned on and LED runs taken

Unresolved Issues

  • SBS Magnet Spikes. Assessed but not fixed. hereJack's Entry (assess more Tuesday or Wed? during beam studies perhaps?)
  • ted BB DAQ issue - status: on the shelf to be surveyed (Tuesday or Wed? during beam studies perhaps?)
  • update wiki instructions for HV stuff given issue above
  • update spreadsheet for SBS8 tab

Subsystem Updates

  • Beamline:
  • DAQ general
  • HCal
  • BBCal
  • Timing Hodoscope
  • GRINCH
  • GEMS
  • Replay analysis