RC meeting and Run Plan, Saturday April 27th

From SBS wiki
Jump to: navigation, search

Back to the calendar

RC Meeting Information

Current RC: Iuliia Skorodumina

No RC meeting today.

Useful Links

Summary

Yesterday around 1:30pm Arc1 Box Supply tripped and the recovery took until around 7pm (see https://logbooks.jlab.org/entry/4289680 and https://logbooks.jlab.org/entry/4289913). Once the beam was back we took a BB singles run on LH2 and then proceeded back to our normal production running with HCal threshold at -10 mV. We ran smoothly overnight.

Andrew Puckett analyzed elastic yield from the BB singles run we took yesterday (see his logentry https://logbooks.jlab.org/entry/4290174) and came to the following conclusions. First, the HCal threshold of -15 mV seems to be too high as it cuts up to 30-50% of good elastic events. This seems to be consistent with David Hamilton's estimations and with what we discussed yesterday during the RC meeting. Therefore, as soon as possible, we should do a new software and hardware gain matching targeting a higher overall gain for HCAL. For the time being, we will run with lower HCal threshold (-10 mV) until we figure out what to do about HCAL HV/gain matching.

Another conclusion of Andrew Puckett's study is that we might also have inefficiency from the BigBite trigger as the BB elastic yield is just about 40% of what we would expect. To better understand the situation we decided to take a test run with lower BBCal threshold (https://logbooks.jlab.org/entry/4290231).

Once we are done with the test run, we will get back to production running on LD2 at 12 uA and -10 mV HCal threshold (and BBCal threshold -395 mV). We will also need to take a 1-hour run on LH2 with the production settings once per shift.

Day shift summary (https://logbooks.jlab.org/entry/4289416).

Swing shift summary (https://logbooks.jlab.org/entry/4289899).

Owl shift summary (https://logbooks.jlab.org/entry/4289941).

Also, we urgently need a TO for the upcoming Sunday Owl shift. Please consider signing up.

We will not have RC meeting today.

Planned Access to the Hall

n/a

Accelerator

Wednesday (05/01) will be the maintenance day. MCC plans to take the beam away at 6:45 am to start working on SL.

Current Run Plan

Today we took a test run with lower BBCal threshold (see https://logbooks.jlab.org/entry/4290231 and https://logbooks.jlab.org/entry/4290326).

After the test run, we are back to our regular production running, which is LD2 target, 12 uA, and -10 mV HCal threshold (and BBCal threshold -395 mV). We will also need to take a 1-hour run on LH2 with the production settings once per shift.

See also Experiment run plans.

Current Issues

  • Bill Henry wants to turn off a few pmts in the active analyzer because they are noisy. He want to do it later this afternoon.

Future plans

  • Wednesday (05/01) will be the maintenance day. MCC plans to take the beam away at 6:45 am to start working on SL.
  • MCC does not plan any major beam changes up until May 14th.