RC meeting and Run Plan, Saturday January 29st
<<SBS Main<<Run Coordinators <<Daily Meetings
Contents
RC Meeting Information
Run Coordinator: Kondo Gnanvo
Time: 3:15 pm
Remote connection link: https://jlab-org.zoomgov.com/s/1619032184
Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715
Upcoming Shifts Which Need Filled
URGENT: Shifts February need help - only 1 opening remaining
Accelerator and Hall Status
Run Plan
- Updated run plan for SBS-8 https://logbooks.jlab.org/entry/3978827
- SBS @ 70% shifted upward => New part #5
- SBS @ 50% shifted downward => New part #6
- Production status
- Fri 1/28 swing to Sa 1/29 day shift: Beam delivery was good
- Part #5 LD2 @ SBS 70% completed early day shift Sa 1/29 (120M events)
- Part#5 LH2 @ SBS 70% on course to be completed by end of day shift
- Will move to part 6 with SBS @ 50% probably sometime during swing shift
Resolved Issues
Unresolved Issues
- one GEM APV disabled => https://logbooks.jlab.org/entry/3977698
- Need in controlled access in to replace the card when there is an opportunity
- Reported issues with SBS magnet current spikes https://logbooks.jlab.org/entry/3978802
- MCC reported that these cause a couple of trips => but things seems ok
- Jack Segal is notified
- Reported issues with unser temperature reading https://logbooks.jlab.org/entry/3978797
- David Flay is notified