RC meeting and Run Plan, Wednesday May 8th

From SBS wiki
Jump to: navigation, search

Back to the calendar

RC Meeting Information

Current RC: Eric Fuchey; Passover to Holly Szumila Vance after RC meeting

RC Daily Meetings are at 3:30 (pm) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

Overall smooth beam delivery.

HV increase on HCal to increase HCal trigger efficiency: https://logbooks.jlab.org/entry/4298852 https://logbooks.jlab.org/entry/4298859 https://logbooks.jlab.org/entry/4298885 Took 2 hrs on LH2 to evaluate the effect of this increase. Improvement of elastic selection while raising threshold to -14 mV: https://logbooks.jlab.org/entry/4299080 One APV had accidentally been removed from the configuration yesterday morning. It was put back in the configuration yesterday evening. https://logbooks.jlab.org/entry/4299090

Planned Access to the Hall

Access Thursday:

  • GEMs work:
    • swap power supplies for currently non-working modules (e.g. rear GEM module 0)
    • possibly, swap non-working APVs on rear GEM modules;
  • Active analyzer:
    • remove signals splitters and send full signal to ADC;
    • adjust side polarimeter thresholds;
  • ECal:
    • get more channels in the ECal readout

Accelerator

Plan unchanged from yesterday:

  • Hall C pass change + Wien angle change on Thursday;
  • no Wien angle change next Tuesday for Hall A pass change;
  • Accelerator beam studies currently scheduled on May 19th starting at 7am

Current Run Plan

Take data at 10 uA for production on LD2: BBCal threshold at -350 mV and HCal threshold at -14 mV for now. Once day (preferably during day shift), take a 3 hours at 15 uA on LH2 with the production settings. See also Experiment run plans.

Current Issues

Future plans

Maybe? A projection of \gamma p -> pi+ n at 2 pass, SH threshold 0.8 GeV