RC meeting and Run Plan, Friday, May 2nd

From SBS wiki
Jump to: navigation, search

Back to the calendar

RC Meeting Information

Current RC: Jiwan Poudel

RC Daily Meetings on Mondays and Wednesday are at 1:00PM, and Tuesdays, Thursdays, and Fridays at 1:30PM, via Zoom and in person in the counting house meeting room (2nd floor).

Zoom info

Useful Links

Accelerator

Hall-A

Completed Work (during Configuration Change)

  • SBS and HCAL to kin#3 position
  • Work on ECAL heating/cooling system completed
  • Target cooled, and TO on shift

Work to be Completed

  • Beam line / corrector#1 fixing bracket
  • SBS lead wall reinstallation
  • ECAL movement to kin#3 position (after fixing corrector braces as it need space to work and for scissor lift)
  • SBS stability test by Ellen (1 hr if everything goes well, can be done on restricted/controlled access)
  • Complete Checklist before closing the hall

Current Issues

  • Closing the hall (??)

Shifts

  • TO required (?), SL (?)

Run plan when MCC is ready to send beam back

Beam Restoration Procedure

Beam requirements

  • start off at 5 pass beam
  • intrinsic beam size (at target): 150–500 µm
  • raster size: 2 mm X 2 mm
  • During kin#3 SBS magnet will be at 1762.23 Amp (from Bogdan, some modification from what was sent to MCC)
  • corrector magnet setting for each pass passed to Yves Roblin
  • production run @ 20 µA for now

Updates on Subsystems

  • ECal,
  • HCal,
  • GEMS,
  • CDET,
  • DAQ,
  • Analysis Software